Construction Planning


Domain

Components

Comments

Construction equipment

  • Earthworks
  • Substructure-below grd.
  • Superstructure-above gd
  • Earth moving
  • Ground structures
  • Visible structures
  • Earthworks

    • Tractors
    • Excavators / backhoes
    • Front shovels
    • Loaders (tract / wheel)
    • Trucks (off-highway)
    • Graders / scrapers
    • Rollers / compactors
    • Surveying equipment
    • Soil investigation
  • Bulldozers
  • For below ground ex.
  • For above gd. hills/cliff
  • Tractor + front shovel
  • Heavy V-shaped trucks
  • Level & grade uneven
  • Compress / compact gd.
  • TBM, levels of eq. / str.
  • Sub-surface exploration
  • Substructures

    • Temporary foundations
    • Permanent foundations

     

      

    • Ground treatment

     

     

    • Basements

     

    • Tunnels

     

    •  Pipelaying
  • Sheet piles
  • Strutting systems
  • Driven R.C. & H piles
  • Bored R.C. piles
  • Contiguous bored piles
  • R.C. diaphragm walls with alternating secant curtains for cohesion
  • Ground anchors-stability, tie-back, anti-uplifts without services
  • Excavations, well-graded fill, grouted soil
  • Below grd. struc., trad. Down-up construction, top-down construction
  • Unloading, soil relief, increased pore pressure, waterproofing, shells, adjacent settlement
  • ~2m depth, cut-lay-backfill-compact cycle
  • Superstructures

    • Visible structures
    • Conventional

     

    • Contemporary
  • Buildings, bridges, etc.
  • Bricks, R.C. on-site, labour intensive, longer construction
  • Precast, Prefab R.C., steel, composites, exotic
  • Hosted by www.Geocities.ws

    1