Escapade Build Report

Next up is covering the fuselage.  The bottom of the fuselage uses a heavier fabric than the other parts.  We cut a piece to cover the bottom and used clothespins to hold it in place.

Once the fabric was glued, John helped iron the fabric to shrink it just like we did earlier on the wings.

After the bottom was finished, we started on the sides.  Ray and Hans are finishing the ironing on the right side.

This picture shows the bottom and rights sides of the fuselage done, and the left side waiting for cover.

<<Previous    Next>>

1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   Links

 

Hosted by www.Geocities.ws

1