Escapade Build Report

At this time, we also decided to work on the flaps and ailerons.  Here the fiberglass leading edge of the right flap is being trimmed to fit up against the front of the ribs.

With the fuel tanks set, the next step is to rivet and epoxy the trailing edges in place.

The left wing sits on the jig.  The Quick Grips hold templates to the bottom of the ribs.  These templates allow the aileron and flaps to be mounted in the neutral position.

The aileron hinge glued and riveted into place.

<<Previous    Next>>

1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   Links

 

Hosted by www.Geocities.ws

1