| • 1966 |
A Recreation
Pavilion is constructed replacing the Old Barn. |
| • 1972 |
The Dining
Hall is renovated at Rancho Framasa |
| • 1974 |
The winterized watering
system is completed. A new pool deck was laid, and the
pipes around the pool were replaced. Lavatory and shower
facilities were added to each of the cabins. |
| • 1987 |
Kevin J. Sullivan becomes
the Camp Director of CYO Camp Rancho Framasa. |
| • 1995 |
Pool is renovated:
new deck, new lighting, new fencing, and chlorinator. |
| • 1996 |
50th Anniversary:First
ever Camp Open House and Work-A-Thon. |
| • 2001 |
New dining facilities
building, the Outdoor Program Center, is completed September
2001. |
| • 2003 |
CYO Camp is at is 57th
summer and operates with over 180 campers per week. |