MAJOR ASSIGNMENTS
1.
Postdoctoral Researcher,
2.
Senior Engineer, BW (Bumi-Watson) Perunding Ltd.,
3.
Technical
Executive for Hamadan & Associate in Total Project
Solution Consultant Sdn. Bhd. Involves in detail designs of tall building,
infrastructures, drainage, water supply and sewerage system in
4.
Project
Manager for Tanigra Construction (A Member of CP (SEA)
Group). Involved in Construction Supervision & design checking of 25
storied CP Tower in Damanasara, KL,
5.
Mid-level Engineer for Jamalpur Project (FAP 3.1) of
6.
Junior Engineer for Systems
Rehabilitation Project (EEC Financed) of
7.
Assistant District Officer (Technical Design) for Feasibility Study of Intensive Rural Works
Programme including Rural Water Supply, Sanitation and Marketing Projects for 5
Upazilas. Rehabilitation and reconstruction of pucca and semi-pucca structures
of 13 Upazilas in
8.
Junior Design Engineer: For Third Flood Rehabilitation Project (IDA Financed) of Local
Government Department. Involved in rehabilitation of Infra-structures of
Western Zone of Bangladesh.
From Aprf2004 to
Marf2006 JSPS Postdoctoral Researcher, Department
of Civil Engineering,
Job description & duties:
Research works include dynamic
behaviors and corrosion cracking problems as well as nondestructive evaluation
of reinforced concrete and numerical analysis for static and dynamic behaviors
concrete by BEM.
From Aprf2001 to
Marf2004 Doctoral Course Student, Department
of Civil Engineering,
From Octf98 to Marf2001 Master Course Student, Department of
Civil Engineering,
From Janf97 to Sep'98 Senior Engineer, BW (Bumi-Watson) Perunding Sdn. Bhd.,
Job description & duties:
·
Design of Hydraulic
Structures: Structural Design of Hydraulic Structures like Overhead tank
(capacity: 2.0 million gallons), Circular tank (capacity: 3.0 million gallons),
Water reservoir (capacity: 10 million gallons), Sedimentation tanks etc.
·
Establishment of a
hydrologic database: verification of data quality for random and systematic
errors; basic analysis of rainfall, water level, discharge and analysis of
river flows and rainfall corresponding to different return period; analysis of
extreme hydrological events using different theoretical probability
distributions.
From Julyf96 to Dec'97 Technical
Executive, Hamadan & Associate and Project
Manager (Engineering), Tanigra Construction,
Job description & duties:
l
Involved in
designing for civil engineering structures
l
Involved in Construction
Supervision & design checking of 25 storied CP Tower in Damanasara, KL,
From Octf94 to Jun'96 Mid-level Engineer, Sir William Halcrow & Partners Ltd.,
BWDB Jamal Project (FAP 3.1)
Job description & duties:
·
SOGREAH-HALCROW-EPC
Consortium involves preparation of Feasibility report, detail design and O
& M Manuals for Jamalpur Project, covering an area of 180,000 ha located in
the district of Jamalpur (FAP 3.1).
·
Hydrologic,
Hydraulic and Structural Design of Hydraulic Structures: Water reservoir,
Sedimemtation tank,
·
Establishment of a
hydrologic database: verification of data quality for random and systematic
errors; basic analysis of rainfall, water level, discharge and analysis of
river flows and rainfall corresponding to different return period; analysis of
extreme hydrological events using different theoretical probability
distributions; flood protection analysis.
·
Analysis of river
water level and velocity at specific sites under different future river
training options which were the basis of detailed designs for the protection of
locations threatened by bank erosion and determination of the size of boulders
or concrete, brick blocks for bank protection.
From Febf92 to Octf94 Junior
Engineer, Sir William Halcrow & Partners Ltd.,
BWDB
Systems Rehabilitation Project (EEC Financed)
Job description & duties:
·
Halcrow-BCEOM-DHV
Consortium involves the screening of 83 sub-projects and the preparation of
feasibility reports, detail designs and O & M Manuals for about 63 Nos.
sub-projects, covering an area of 365,000 ha located throughout
From Febf91 to Febf92 Assistant
District Officer (Technical Design), WRE, HIFAB INTERNATIONAL, RESP-II, Infrastructure
Development Project (IDP)
Job description & duties:
l
Involved in the
screening of 10 Nos. sub-projects and the preparation of feasibility
reports, detail designs and O & M Manuals for about 6 Nos. sub-projects,
covering an area of 5,000 ha located in the district of Faridpur, financed by
SIDA & NORAD. Served also as Laboratory In‑Charge, Material Testing
Laboratory. Monitoring and supervision of Rural Water Supply system. Preparing
specifications & Tender documents of Schemes and Estimating of Rural Water
Schemes. Performing detail Engineering Survey and sub‑soil investigation of
production well.
l
From Decf89 to Febf91 Junior Design
Engineer, Engineering and Planning Consultants Ltd,.
Third Flood Rehabilitation Project
Job description & duties:
Involved in
designing, specificationing and estimating of 12m to 63m long