| Lang Timber Frame 4 | ||||||||||||
![]() |
![]() |
|||||||||||
| Second Floor Framing on August 24th | View of the Great Room from the Second Floor | |||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
| Roof Framing | ||||||||||||
| Dovetail Joint. It's a shame that it gets covered up by the subfloor. | ||||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
| More Timber Frame | ||||||||||||
![]() |
||||||||||||
| and even more Timber Frame | ||||||||||||
![]() |
||||||||||||
| and still more Timber Frame | ||||||||||||
| Here's a view of the Ceiling after it was installed on the 25th | ||||||||||||