Northwest Territories (N.W.T.) Gold Bar/Brick Production - Updated December 2005 - by Ryan A. Silke ([email protected])

Gold Mine Total Bars Production Years Notes Reference
Burnt Island 12 + 1990 number estimated by Bill Knutsen Personal communication with Bill Knutsen
Camlaren 23 1963 milled and poured at Discovery Mine Discovery Mine Progress reports, 1963
Camlaren (1) ? 1980-81 poured down south??  
Colomac (2) 576 1990-91, 94-97   Colomac Mill Assay logs
Colomac 25 1998 cleanup ores, processed at Giant Mine Giant Mill Assay logs
Con (Cominco) 6746 1938-1986 Cominco production to December 10th 1986. Mill idle for 3 year period 1943-1946. Con Mine Records
Con (Nerco) (3) 1200+ 1986-1993 Nerco production from December 11th 1986 to 1993 Con Mine Records, incomplete
Con (Miramar) (4) Bars #1-1078 1993-1999 Miramar production, only to the time of Giant Mine acquisition end of 1999. See Note (5) for an explaination. Mill idle for 1 year period 1998-1999. Con Mine Records
Con-Giant (Miramar) (5) Bars #1079-2025 2000-2003 Combined Con and Giant Mine production until Dec 3rd 2003, when the last bars containing Con production ore was poured (Bar #2025). Also includes gold recovered from arsenic and calcine wastes until December 2003. Con Mine Records
Cullaton Lake (1) ? 1983-1985 No known record exists.  
Discovery 1542 1950-1968 does not account for Jan-Apr 1969 production Discovery Mine Progress reports, 1968
Discovery 14 Jan-Apr 1969 Mill burned down May 1969 RC Mint Bullion Records
Giant 11,847 1948-1999 plus 313 Carbon Plant gold bars Giant Mill Assay logs
Giant (Miramar) (6) unknown 2003-2004 Production after Dec 3rd 2003 is Giant ore only, processed at the Con Mine mill.
Lupin ? 1982-present Mill idle for 1 year period 1998-1999.  
Mon ? 1990, 1992-1997 refined in Yellowknife by Garth Eggenberger  
Negus (7) 500+ 1939-1952, 1953   Coulson, 1950
Nose Group 1 1967 milled and poured at Discovery Mine Northern Miner Newspaper article
Outpost Island 37 1941-1942 Other gold contained in concentrates. 1952 production of gold was only in concentrates. RC Mint Bullion Records
Ptarmigan (Cominco) 26 1942   Ptarmigan closing report, Sept 1942; RC Mint Bullion Records
Ptarmigan/Tom (Treminco) N/A 1986-1989 Ore was custom milled at Giant Mine. Gold poured as part of Giant bars. Ptarmigan Mill Assay logs
Ptarmigan/Tom (Treminco) 431 1989-1997 small gold bar size. Includes ore from Tom Mine. Other gold was contained in concentrates. Ptarmigan Mill Assay logs
Ruth 1 Sept. 2nd 1942 included in Con Mine pour #246 Con Mine Records
Ruth (8) 4 1959 poured down south?? RC Mint Bullion Records
Salmita 284 1984-1987 poured at Giant Mine Giant Mill Assay logs
Thompson-Lundmark 83 1941-1943   RC Mint Bullion Records
Thompson-Lundmark 39 1947-1949   RC Mint Bullion Records
Tundra 202 1964-1968   Tundra Mill Assay logs
West-Bay 5 1948 small gold bar size. Northern Miner articles 1948

(1) Little or no information available. Possible data to be found at RC Mint.

(2) Colomac gold bars are from Colomac assay logs during 1997-1998. It is assumed that when Royal Oak bought the property in 1994, they carried on using the former operators gold bar inventory system. No earlier records exist to support this, but the total of 601 bars IS a fairly good production record for the life of this mine. Presuming Colomac poured 800-1000 ounce gold bricks, this number also fits in nicely with the amount of gold the mine produced (535,708 oz).

(3) Nerco-Con had poured 1177 gold bars between December 11th 1986 and December 30th 1992. No records could be found to indicate bars poured at the time of sale to Miramar Mining in October 1993.

(4) The gold bar inventory for Miramar also includes the production of 'oscars', small refined gold pieces left over from the refining process and in too small an amount to make up a normal sized gold bar. As a result of this process, gold bar production for Miramar Con-Giant would be inflated due to the presence of oscar production (which constitutes about 1/5 of physical pours).

(5) The Giant Mine was purchased by Miramar Mining late 1999, and production of ores from Giant began early in 2000 using the Con milling plant. Since gold product is amalgamated during the recovery-gold pour process, the Con-Giant operation years 2000-2003 are reported elsewhere to clarify that Miramar gold bar production was the product of the two mines, not just Con Mine.

(6) Mining of Con Mine ores ceased November 28th 2003, and the last gold pour containing Con Mine ores was on December 3rd 2003 (Bar #2025). Milling of Giant ores until July 2004. Includes production of gold from Con Mine arsenic and calcine wastes processed in the autoclave. Gold recovery of Con Mine wastes continued until December 2004, but no information on gold pours is available.

(7) According to a geological report by Coulson in 1950, Negus poured it's 500th gold bar in June 1950. Records of the RC Mint indicate that only 289 gold bars were bought from Negus between 1939 and 1952, with 2 additional bars poured at Negus during final cleanup in 1953. It is possible that not all of the bars poured by Negus were sold to the RC Mint, and no mine records exist to support a definitive number of gold bars poured at the mine.

(8) No refinery operated at the Ruth Mine, therefore it is not known where these gold bars were produced.

Hosted by www.Geocities.ws