Shah Consult International

(P.) Ltd.

ENGINEERING, ARCHITECTURE, PLANNING & MANAGEMENT CONSULTANTS

Project No.: 8

Assignment Name:

Upper Marsyangdi Hydroelectric Project

Country:

Nepal

Location within Country:

Lamjung District in western Nepal.

Professional Staff provided by the Firm: 5

Name of Client:

Matthews International (A Division of MATCO), Ontario, Canada.

No. of Staff:

4

Address:

Baluwatar, Kathmandu, Nepal

No. of Staff-Months, duration of assignment:

3, 0.4 years

Start Date (Month/Year):

April 1995

Completion Date (Month/Year):

July 1998

Approximate value of Services (in Current US$):

7,000

Name of Associated Consultants (if any):

Canadian International Water & Energy Consultants (CIWEC).

 

No. of Months of Professional Staff provided by associated Consultants:

1

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

Mr. R.C. Chaudhary - Team Leader, Hydropower Engineering.

Dr. Sandip Shah - Geotechnical Engineering.

Dr. Sanjiv Shah - Project Designs.

Mr. K.N. Kafle - Engineering Geology.

Mr. R. Shah - Project Coordinator.

Narrative Description of Project:

Run-of-the-river scheme with an installed capacity of 45 MW, diversion dam, intake, desanding facility, surface penstock/tunnel and power house.

Description of Actual Services provided by the Staff:

Feasibility Study Stage:

  1. Reconnaissance study of penstock route from the intake at Ngadi to the powerhouse at Khudi, including preliminary socio-economic and environmental impact assessment of the alignment.

 

32 & 34 SHIVA MARG, BANESWAR, GPO BOX NO. 3840, KATHMANDU, NEPAL

PHONE: +977-1-471852, 492860, 492127

FAX: +977-1-471852

Back To Home

Hosted by www.Geocities.ws

1