Shah Consult International

(P.) Ltd.

ENGINEERING, ARCHITECTURE, PLANNING & MANAGEMENT CONSULTANTS

Project No.: 6

Assignment Name:

Trishuli Devighat Hydropower Upgrading Project

Country:

Nepal

Location within Country:

Nuwakot District in central Nepal.

Professional Staff provided by the Firm: 1

Name of Client:

Nepal Electricity Authority, Medium Hydropower Study Project – Canadian International Water & Energy Consultants (CIWEC)

No. of Staff:

1

Address:

Lazimpat, Kathmandu, Nepal

No. of Staff-Months, duration of assignment:

6, 2 years

Start Date (Month/Year):

July 1993

Completion Date (Month/Year):

June 1995

Approximate value of Services (in Current US$):

7,000

Name of Associated Consultants (if any):

NA.

 

No. of Months of Professional Staff provided by associated Consultants:

NA

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

Dr. Sandip Shah - Geotechnical Engineering, Materials Engineering, Quality Control.

Narrative Description of Project:

Upgradation of the power generation of the Trishuli and Devighat Hydroelectric Projects by 95 GWh annually by rehabilitating and upgrading hydraulic structures and electro-mechanical equipment in the power house.

Description of Actual Services provided by the Staff:

Construction Management Stage:

  1. Design and construction supervision of foundation systems, including well foundations, for major hydraulic structures, seepage analysis, landslide investigation and stabilization.
  2. Design of high-strength concrete mixes and construction supervision of prestressing of aqueduct flume.
  3. Selection of fill materials and quality control of construction materials.

 

 32 & 34 SHIVA MARG, BANESWAR, GPO BOX NO. 3840, KATHMANDU, NEPAL

PHONE: +977-1-471852, 492860, 492127

FAX: +977-1-471852

Back To Home

Hosted by www.Geocities.ws

1