Shah Consult International
(P.) Ltd.

Project No.: 11
|
Assignment Name: Tama Koshi - III Hydroelectric Project |
Country: Nepal |
|
|
Location within Country: Dolakha District in central Nepal. |
Professional Staff provided by the Firm: 4 |
|
|
Name of Client: Indsil Electrosmelts Ltd. Coimbatore, India. |
No. of Staff: 6 |
|
|
Address: Coimbatore, India |
No. of Staff-Months, duration of assignment: 8, 1 year |
|
|
Start Date (Month/Year): May 1996 |
Completion Date (Month/Year): March 1997 |
Approximate value of Services (in Current US$): 9,000 |
|
Name of Associated Consultants (if any): NA |
No. of Months of Professional Staff provided by associated Consultants: NA |
|
|
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed: Mr. R.C. Chaudhary - Team Leader, Hydropower Engineering. Dr. Sandip Shah - Geotechnical Engineering. Dr. Sanjiv Shah - Project Designs. Mr. K.N. Kafle - Engineering Geology. Mr. R. Shah - Project Coordinator.
|
||
|
Narrative Description of Project: Pondage-run-of-the-river scheme with an installed capacity of 123 MW, 63 m high rock-filled dam, surface desander, 7 km tunnel conveyance system, surge tank and surface powerhouse. |
||
|
Description of Actual Services provided by the Staff: Pre-feasibility Study Stage:
|
||
32 & 34 SHIVA MARG, BANESWAR, GPO BOX NO. 3840, KATHMANDU, NEPAL
PHONE: +977-1-471852, 492860, 492127
FAX: +977-1-471852