Shah Consult International

(P.) Ltd.

ENGINEERING, ARCHITECTURE, PLANNING & MANAGEMENT CONSULTANTS

Project No.: 10

Assignment Name:

Upper Bhote Koshi Hydroelectric Project

Country:

Nepal

Location within Country:

Sindhupalchowk District in central Nepal.

Professional Staff provided by the Firm: 1

Name of Client:

Nepal Electricity Authority.

No. of Staff:

1

Address:

Tundikhel, Kathmandu, Nepal

No. of Staff-Months, duration of assignment:

4, 0.5 years

Start Date (Month/Year):

April 1993

Completion Date (Month/Year):

October 1993

Approximate value of Services (in Current US$):

2,000

Name of Associated Consultants (if any):

NA

No. of Months of Professional Staff provided by associated Consultants:

NA

Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:

Dr. Sandip Shah - Geotechnical Engineering.

Narrative Description of Project:

Run-of-the-river scheme with an installed capacity of 36 MW, 65 m long weir, underground desander, 3.3 km tunnel, underground surge tank, surface powerhouse and 30 km long 132 kV transmission line.

Description of Actual Services provided by the Staff:

Feasibility Study Stage:

  1. Geological and geotechnical investigations, preparation of geological maps and sections of the project area, classification of rock mass, interpretation of field data, preliminary analysis and design of headrace tunnel, access tunnels, underground desanders, surface slopes using sophisticated computer software, rate analysis and cost estimation.

 

 

32 & 34 SHIVA MARG, BANESWAR, GPO BOX NO. 3840, KATHMANDU, NEPAL

PHONE: +977-1-471852, 492860, 492127

FAX: +977-1-471852

Back To Home

Hosted by www.Geocities.ws

1