Assignment Name: Upper Bhote Koshi Hydroelectric Project |
Country: Nepal |
|
|
Location within Country: Sindhupalchowk District in Central Nepal. |
Professional Staff provided by the Firm: 7 |
|
|
Name of Client: Bhote Koshi Power Company Ltd., a joint venture of Himal International Power Corporation, Nepal, Harza Engineering Company International L.P., U.S.A., and Panda Energy International Inc., U.S.A |
No. of Staff: 10 |
|
|
Address: Tahachal, Kathmandu, Nepal. Phone & Fax: +977-1-270027 |
No. of Staff-Months, duration of assignment: 35, 4 years |
|
|
Start Date (Month/Year): November, 1994 |
Completion Date (Month/Year): On-going |
Approximate value of Services (in Current US$): 55,000 |
|
Name of Associated Consultants (if any): Harza Engineering Company International L.P. |
No. of Months of Professional Staff provided by associated Consultants: 100 |
|
|
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed: Mr. R.C. Chaudhary - GLOF Study of Bhote Koshi River Basin, Transmission Line Study Dr. Sandip Shah - Geotechnical & Landslide Studies, Transmission Line & GLOF Studies Dr. Sanjiv Shah - Landslide Study, Transmission Line Study, Building works Ms. Poonam Shah - Building Works Ms. M.S. Shrestha - Hydrology and GLOF Studies Mr. J.M. Shrestha & Mr. P.B. Pradhan - Transmission Line Study Dr. M.D. Joshi & Mr. R. Chaudhary - EIA of Transmission Line |
||
|
Narrative Description of Project: Run-of-the-river hydropower scheme with an installed capacity of 36 MW, 65 m long weir, surface desander, 3.3 km tunnel, underground surge tank, surface power house and 30 km long 132 kV transmission line. |
||
|
Description of Actual Services provided by the Staff: Project Definition Study and Detailed Engineering Stage:
|
||