SF&SA RR Garden Division (the Wife's) - 2-6-0 crossing the pond.
Areas of the SF&SA RR Continued
The Garden Division (G-Scale) of the SFSARR under sonstruction.
Testing train and track on level surface first.
44-Toner cleaning the SFSARR Garden Division track.