- THE GROSS AREA OF THIS SUBDIVISION IS 80.03 ACRES.
- THE OWNER COVENANTS THAT THERE WILL BE NO FURTHER SUBDIVIDING OR LOT SPLITTING WITHOUT THE WRITTEN APPROVAL OF THE BOARD OF SUPERVISORS.
- BASIS OF BEARINGS IS: THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION 14. TOWNSHIP 13 SOUTH, RANGE 15 EAST, GILA & SALT RIVER MERIDIAN. BEARING BEING NORTH 03 DEGREES 29 MINUTES 58 SECONDS WEST.
- TOTAL MILES OF NEW PUBLIC STREETS IS: 0 MILES.
TOTAL MILES OF NEW PRIVATE STREETS IS: 1.07 MILES.
- COMMON AREAS:
COMMON AREA "A" (PRIVATE ROAD): 216,700 SF
COMMON AREA "B" (OPEN AREA): 33,037 SF
- THIS PROJECT IS SUBJECT TO ADMINISTRATIVE CONTROL NOTES AS EVIDENCED IN THE PIMA COUNTY SUBDIVISIONS COORDINATOR'S OFFICE FILE Co12-93-11.
- DETENTION/RETENTION REQUIREMENTS HAVE BEEN MET FOR THIS SUBDIVISION WITH THE GOLF COURSE DEVELOPMENT PLAN, THEREFORE, DETENTION/RETENTION WILL NOT BE REQUIRED FOR THIS SUBDIVISION.
- LOCAL TRAIL NO. 105 AS DESCRIBED IN THE EASTERN PIMA COUNTY TRAIL SYSTEM MASTER PLAN RUNS ALONG THE HOUGHTON RD. ALIGNMENT JUST TO THE EAST OF THIS SUBDIVISION. PIMA COUNTY OWNS A 30 FT. UTILITY/PEDESTRIAN ESMT. IN SECTION 13 ALONG THE SECTION LINE AND A 30 FT. INGRESS/EGRESS ESMT. IN SECTION 14 ALONG THE SECTION LINE FROM THE SOUTHEAST CORNER OF THIS SUBDIVISION SOUTH TO SNYDER RD.
- THE MINIMUM LOT SIZE FOR THIS SUBDIVISION IS 21,780 SQ. FT. THE MINIMUM YARD REQUIREMENTS ARE: FRONT YARD .... 30.00' SIDEYARD .... 10.00' REARYARD .... 40.00' CORONADO NATIONAL FOREST BOUNDARY .... 100.00'
- THIS PLAT IS SUBJECT TO CERTAIN DECLARATION OF COVENANTS, CONDITIONS, AND RESTRICTIONS FOR SABINO SPRINGS AS RECORDED IN DOCKET 9522 AT PAGE 551 PIMA COUNTY RECORDER'S OFFICE AS AMENDED.
- LOTS 1 - 45 MAY BE SUBJECT TO THE HILLSIDE DEVELOPMENT OVERLAY ZONE AS DETERMINED BY REVIEW OF BUILDING SITE SLOPE ANALYSIS (AT THE TIME OF BUILDING PERMIT SUBMITTAL) BY THE DEPARTMENT OF TRANSPORTATION AND FLOODCONTROL DISTRICT. ANY DEVELOPMENT TO BE PLACED THEREON SHALL BE SHOWN TO CONFORM TO THE REQUIREMENTS OF THE HILLSIDE DEVELOPMENT OVERLAY ZONE PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS.
- THE TWO 24' INGRESS/EGRESS EASMENTS SERVING LOTS 9, 11, 12 AND 23, 24, 25, AND 43, 45, RESPECTIVELY, WILL BE PAVED PRIOR TO ISSUANCE OF BUILDING PERMITS FOR ANY OF THE ABOVE - MENTIONED LOTS.
|
|