Four Main IC Manufacturing Stages
(Harrison 1989; Chen 1987)

The following chart lists 4 main manufacturing stages through which a wafer lot passes, where each stage is usually performed, and typical cycle time and yields for each stage.

STAGE LOCATION CYCLE TIME YIELD
1. Wafer Fabrication Fabrication Plant 20-40 days 92% ( good wafers)
2. Wafer Probe Fabrication Plant 3-5 days 25 -75% para produtos maduros
(die bank inventory)      
3. Chip Assembly Assembly plant 3-10 days 92-98% Plant (units out  per unit started)
4. Chip test Assembly plant 4-15 days 10-92% Plant (low for  new products)
(final goods inventory)   30-70 days( overall) 30-70 days( overall)