 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
 |
|
|
|
 |
|
|
|
|
 |
|
|
|
|
|
|
|
|
Friends came to help us set our first wall. The bottom four feet was foundation, so the wall had to be dropped (gently) into a trench. It is our south wall and all the openings are for windows and a door. The view is out into our woods. |
|
|
|
 |
|
|
|
 |
|
|
|
|
|
It took one WHOLE day to lift this wall into place. The lower portion has foundation grade 3/4" plywood where it will be in contact with the hillside. |
|
|
|
Using our new electric winch we lifted the identical wall on the opposite side in less than two hours. |
|
|
|