Project Summary and Costs
The Royal College Swimming Pool, which is over 30 years old now is badly in need
of major repairs and renovations. The Board of Management has, in the recent
past, carried out some essential improvements such as replacing the Filtration
System, Chlorination System, and refurbishment of the Canteen with it’s own
funding. The Board of Management is unable to fund the repairs presently needed
and therefore is looking out for financial assistance.
The details of the repairs needed are as follows:
- Most of the Wall Tiles on the vertical surfaces has aged so badly that the
glazing has been badly damaged. This results in algal and fungal growth on the
rough surfaces which is very unsightly and difficult to clean.
- The tiling on the floor is also aged buut not to the same extent. As the pool
has to be closed for a long period to carry out the first repair it may be
prudent to replace the tiling on the floor as well at the same time.
- The rounded tiles on the edge of the skkimmer has not been considered for
replacement as it has to be specially manufactured or imported. It will be very
good if this too could be replaced at the same time which would result in a
total renovation of the pool.
The budgetary cost estimates are as follows:
01 - Removing of existing tiling on walls and floor taking necessary precautions
to protect the special edge tiles on the skimmer drain.
02 -
Removing the backing and bedding as necessary, and carting away the debris (51
Sqrs.) Rs.80,000.00
03 - Waterproofing of all surfaces (42 Sqrs.) Rs.400,000.00
04 - Tiling of walls with homogenous, vitrified, 8” x 4” tiles complete with
grouting (25 Sqrs.) Rs.375,000.00
05 - Tiling on pool floors (18 Sqrs.) Rs.270,000.00
06 - Tiling on curb walls on outer edge of pool (6.7 Sqrs.) Rs.102,000.00
07 - Tiling on Foot Wash (0.4 Sqrs.) Rs.6,000.00
08 - Tiling on steps (0.7 Sqrs.) Rs.12,000.00
09 - Tiling on Starting Blocks (0.2 Sqrs.) Rs.3,000.00
10 - Contingencies @ 10% Rs.125,000.00
Total Estimated Cost is Rs.1,373,000.00
The above is only a budgetary estimate. A detailed BOQ will be drawn up and
quotations called for when the work is to be carried out, which will be
available to RCUAE as the sponsor of the project.
RCUAE sincerely hopes that the effort to provide the necessary financial
assistance to carry out these much needed repairs to the Royal College Swimming
Pool, will help in maintaining the only asset the RCU has at present.
Further details on the project will be available with:
Mr. Wijitha Perera, Hony. Secretary,
Board of Management, Royal College Union Swimming Pool.
---------------------------------------------------------------------------------
Project Financing Status (as at end May 2000)
Total financial commitment towards the fund as at 25 May 2000 was AED 9893/= (which is less the subscription donations)---------------------------------------------------------------------------------
Report on