collecting mud
mud construction
-
process
- collecting mud
collect soil after depth of 60cms only.
do not use top organic soil.
do not use hard rock.
remove organic matter from the soi.;
replace top soil after excavating.
mud construction
<<back
next>>
Posted by Ar. Guruprasad Rane on 28th Jan 2006.
Email :
[email protected]