mortor testing |
|
|
mud construction - masonry -
block laying |
|
|
- Soak the blocks before applying the mortar.
- Keep 1cm joint thickness.
- Never fill vertical joints afterwards, apply mortar on side of the previous
block.
- Re-point the joint the same day when the mortar is still fresh.
|
|
|
| mud construction |
<<back |
next>> |
|
| Posted by Ar. Guruprasad Rane on 28th Jan 2006. |
Email : [email protected] |