Maintenance-Of-Way
|
The maintenance crews prepare the new section snap track for installion in front of the St. Catharines station. |
|
|
The excavator digs out the mud and smoothes out the base so the new panel track can be laid. |
|
|
Another view of the excavator working on the north track at mile 11.8 on the Grimsby Sub. |
|
|
The machines are working during the afternoon digging the mud out still and loading it all into the dump track parked on the right. |
|
|
Big Brad on the left with the big hat. |
|
|
The replacement ties are being installed with a backhoe on the north track in front of the St. Catharines Station. |
|
|
The Fairmont tamper works away at St. Catharines on the south track of the Grimsby Sub during the spring of 2003. |
Copyright Ó 2003 - Dean Brown