[email protected]                                                                                                                                                                               +6281330526560
  
                             




RF Engineering & Optimization,
                           Banyu Urip Lor V / 30     Surabaya 60253, East Java - Indonesia
  Summary
-   Vast Experience in Drive test and Optimization on CDMA Radio Networks system.
-   Proficient in troubleshooting, resolving and improve performance of CDMA radio networks.
-   Adjustment of Samsung BSS system Parameter.
    
   CDMA 2000 1x Experience Project
MPPA 2 Project                                                               PT. Telkom Flexi Div V, East Java, Indonesia                                August 6, 2007 - Present 
-  
National Expansion Project                                                PT. Mobile - 8, Denpasar, Bali, Indonesia                                                            July 2007.
-  
National Expansion Project                                                PT. Mobile - 8, Makassar, South Sulawesi, Indonesia                                          June 2007.
-    FA Expansion and Network reconfiguration project             PT. Mobile - 8, Indonesia, for East Java Area                                                      May 2007.
-  
RF Optimization and Maintenance Project                           PT Telkom Flexi Div V , Indonesia,                                    December 2006 - February 2007.
-   SCFT (Single Cell Function Test)                                      PT. Mobile - 8, Indonesia, for Central Java Area                                          November 2006.
   Highlight of Training
-   30 days,               Optic Fibre Communication system,                          PT. Indosat Tbk, Surabaya, Indonesia,                                                      1999.
30 days,                HFC (Hybrid Fibre Coaxial) Network system,            PT. Broadband Multimedia Tbk, Surabaya, Indonesia,                                 2004.
-   30 days,                Satellite acceptance on TV cable system,                   PT. Broadband Multimedia Tbk, Surabaya, Indonesia,                                2005.
-   4 days,                 Regional Technical workshop,                                  FUJITSU PC Asia Pacific Pte Ltd, Singapore,                                            2005.
-   1 day,                  CDMA Network Engineer                                        FTI - Institute Technology 10 Nopember, ITS, Surabaya, Indonesia,            2005.

   
Education
-   EEPIS (Electronics Engineering Polytechnic Institute of Surabaya) - ITS, Diploama 3 year level, Surabaya, Indonesia. GPA 2.99 / 4.0.
    In last project Title : "
Design and construction electrics equipment controller through telephone network using digital circuit".

-   Department of Electrical Engineering, in Study program Telecommunication Multimedia, Institute Technology 10 Nopember, ITS, Surabaya, Indonesia.
    GPA    2.70 / 4.0
    In last project title : "
Rain Intensity Prediction Using Artificial Neural Network Method".

   
Work History
-   RF Engineer & Optimization,                 PT. Samsung Telecommunication, Surabaya, Indonesia,                                                  09/2006 - Present.
-   Technical Support Engineer,                  Fujitsu pc Partner NEXcomtech, Surabaya, Indonesia,                                                   09/2004 - 08/2006.
-   Technician,                                         Sony Ericsson Mobile Phone service centre, Surabaya, Indonesia,                                    06/2001 - 09/2004.

   
Summary of Skills
-   Innowireless, OPTIs-Slot, OPTIs-4v, CDMA Drive Test tool indoor and outdoor.
-   Willtek, Blueroose CDMA 2000 1x & Ev-Do, Drive  Test tool indoor and outdoor.
-   OPTIs-DO Analyzer & IDA II CDMA 2000 1x & Ev-Do Software analyzer.
-   MS Office, Visio, Map Info, MATLAB.

  
Sample Picture of several activity optimization project
CDMA sectoral antenna, to check antenna configuration condition
Panoramic Photo to optimize coverage area
BTS Equipment on site to check and optimize output power system.
Romulus Ramses Pangihutan
Hosted by www.Geocities.ws

1