For your
viewing pleasure, you will find here photos of Krakatoa
during the construction phase.
Here
is some testing of a sample composite section.
Our
preliminary design was done using ANSYS, a finite
elements package. We also used it to assess the
stress distributions.
NB:
This image only shows the general form of the
canoe, not the results of analysis.
Last
year we put epoxy over the styrofoam, then sanded
the male mould and poured the concrete. This
resulted in an uneven bottom, and the loss of a
week removing the bonded styrofoam. Sanding
first, and then applying this plastic sheeting
allowed us to remove the mould in a morning.
We
tested our design in one of the flumes available
in the Civil Department, comparing the drag with
that produced by a model of last year's design.
This
is a picture of the pour. The concrete was
sufficiently stiff that we packed in on by hand.
Last modified: 13 May 1999 Web Design by Marc Grégoire