| Basic Data |
|
| Annual Intake (3 year programme) |
180 |
| 60 each in the branches/
discipline of Civil, Mechanical and 30 each in
Electrical and Electronics |
| Total No. of student |
540 |
| Teaching faculty required |
3 |
| Administrative Area |
Sq.m. |
| Principal |
30 |
| Principal's office (confidential) |
25 |
| Head of Department(4 nos.) |
60 |
| Main office |
200 |
| Reception |
25 |
| Departmental office(5 nos.) |
100 |
| Maintenance & Estate office |
25 |
| Faculty rooms |
300 |
| Seminar rooms |
30 |
| Confidential room |
25 |
| Store |
100 |
| Drawing/ Reprographic |
20 |
| Total Carpet |
940 |
| Plinth area |
1315 Sq.m. |
| Academic Area |
Sq.m. |
| Class rooms (6 nos.) |
360 |
| Tutorial room (3 nos.) |
99 |
| Drawing Hall(3 nos.) |
450 |
| Workshop |
840 |
| Library |
150 |
| Basic Science Laboratories Area
|
|
| Applied Physics Laboratory |
120 |
| Applied Chemistry Lab |
120 |
| Metal Testing & Applied Mechanics
Laboratory |
90 |
| Engg. Materials, Museum and Model Room |
100 |
| Specialized Laboratories Area
|
|
| Mechanical Engineering |
|
| Production Technology Lab |
90 |
| General Mechanical Engg. Lab |
75 |
| Heat Power Engg. Lab |
120 |
| Hydraulics & Hydraulic Machinery |
90 |
| Materials & Metallurgical Lab |
75 |
| Electronics
Engineering |
|
| Electronics Lab (Basic & Applied) |
75 |
| Communication Engg. & Digital
Electronics Lab. |
75 |
| Entertainment Electronics Lab |
75 |
| Electrical Engineering |
|
| Electrical & Electronics Workshop
(Wiring Lab) |
100 |
| Basic Electricity, Measurement and relay
Lab |
75 |
| Electrical Machinery Lab |
90 |
| Power Engineering Lab |
90 |
| Civil Engineering |
|
| Construction Technology Lab |
75 |
| Survey Store |
60 |
| Construction Material Testing and Concrete
Lab |
90 |
| Soil Mechanics Laboratory |
75 |
| Environmental Engg. Lab |
7 |
| Computer Centre |
|
| Computer Centre |
120 |
| |
1970 |
| Total carpet area (academic)
|
3870 |
| Total Plinth area (academic) |
5240 Sq.m. |
Total space required for academic and
administrative area 2*(l315+5420)=l3470 sqm
or 3.4 acres |
|
| Residential and Amenities Area
(Desirable) |
|
Assumption (Two hostel blocks of 120
students is provided)
|
|
| Area required for residence blocks(120*9)
|
1080 |
| Kitchen and Dining Hall |
200 |
| Indoor games - students centre |
150 |
| Medical Room |
50 |
| Canteen |
15 |
| Warden Office |
18 |
| Guest Room (2 rooms) |
18 |
| Total carpet area for students
hostel |
1531 |
| Total plinth area for students hostel |
2962 Sq.m. |
| Staff Residences |
|
| Principal |
140 |
| Head of Department ( 5 tios.) |
500 |
| Warden (2nos.) |
200 |
| Hostel type accommodation for 25% facult
(8*30) |
240 |
| Essential Staff (for two
hostels)(10*20) |
200 |
| Total carpet area for staff
residences |
1280 |
| Total Plinth area |
1790 Sq.m. |
| Amenities |
|
| Guest House |
300 |
| Students activity centre |
130 |
| Canteen, Co-operative store and NCC |
300 |
| Total Carpet area |
730 |
| Total Plinth area |
1020 Sq.m. |
Total space required for
residential and amenities area 2*(plinth area
for student hostel-+staff residence+amenities
area) 2*(2962+1790+1020) = 1544 sqm or 3.8
acres Total space required for Technician
Education is (13470+11544*+Open air
theatre*+Play ground) 54000 sqm or 13.5
acres(desirable) 25014 sqm(minimum for
metros, provided open air theatre and play
grounds are available
elsewhere) Desirable |