Eight
building additions to an existing facility providing sufficient water
treatment
service to the growing residential area in
1.
Coordinated with Process and Mechanical engineers in PD and DD phases
on developing
a building design and making the design agrees with architectural
aesthetics,
construction modular and building codes.
2. Created color
presentation package containing site plan, site elevation, building
elevations
for a public hearing held by City of
3. Designed
exterior appearance of the buildings.
4. Designed
and adjusted an interior planning based on Process requirement and
Architectural system.
5. Created a
complete set of final construction drawing.
6. Selected
actual building material and colors and also reviewed submittals
submitted by
contractors during construction phase.

A
new
customer briefing room in a manufacturing building in SUN Microsystems
campus.
My
responsibilities:
1. Coordinated
with a client on design requirement and criteria.
2. Studied
an impact of a new construction on existing adjacent assembling areas
in the building.
3. Created
preliminary sketches and presented to the client.
4.
Coordinated with Electrical engineer on designing lighting and audio
vision
systems in the room.
5. Designed
interior appearance of the room.
6. Created a
complete set of final construction drawing.
7. Selected
finish materials and colors.
8. Assisted
principal architect on supervising the construction process.

A
new campus
center locating in Lowry community. The campus center housing
performing arts
space, art and music classrooms, library, and admin offices.
1. Designed
an exterior appearance of the building
2. Designed
an interior space per user behavior and other collected data.
3. Assisted
a principal architect on designing a site plan.
4. Created presentation package and presented to the client.

A
renovation for an existing entry lobby in a building in SUN
Microsystems
campus.
1. Coordinated
with a client on design requirement and criteria.
2. Studied
an impact of a new construction on existing adjacent assembling areas
in the
building.
3. Created
preliminary sketches and presented to the client.
4.
Developed the design to construction document.


Multiple
structure designed to fit into a historic and farm site minimizing
impact on
adjacent park and farmland, wildlife corridors and historic structures.
1. Created
a free hand sketch of building for preliminary design.
2. Assisted
principal architect on designing exterior appearance of the building.
An
addition
to an existing facility providing sufficient water treatment service to
the
growing residential area in the County. The additions comprised of an
admin building
and two process buildings. The large canopy in front of admin building
served as a gathering space
for a field trip of school children.
My
responsibilities:
1.
Coordinated with a client on design requirement of admin building.
2. Studied
an impact of a new construction on existing adjacent building.
3. Created
preliminary sketches of the admin building and presented to the client.
4.
Coordinated with Process and Mechanical engineers in PD and DD phases
on
developing a building design and making the design agrees with
architectural aesthetics,
construction modular and building codes.
5. Created
Site Improvement Package presentation containing site plan, site
elevation,
building elevations for a public hearing held by City of
6. Designed
exterior and interior of the admin building.
7. Designed
and adjusted an interior planning based on Process requirement and
Architectural system.
8. Created
a complete set of final construction drawing.
9. Selected
actual building material and colors and also reviewed submittals
submitted by
contractors during construction phase.
10. Assisted
a principal architect on creating a final report of substantial
completion.

A
new
collaborative lab to enhance efficiency in fuel cell research.
http://www.state.co.us/oemc/programs/distributed/fuelcells/center.htm
1. Surveyed
and studied existing condition for a possibility of construction.
2. Assisted
a principal architect on studying the egress system and hazardous codes.
3. Created equipment
plan with associated system to provide feasibility in construction
resulting in
construction cost saving.
4. Coordinated
with Mechanical and Electrical on providing feasible HVAC and
Electrical systems
throughout the space.
5. Created
a complete set of construction drawing.
Located
in
downtown
My
responsibilities:
1.
Coordinated with clients on design requirement and criteria.
2.
Developed and designed interior space per user behavior and building
code.
3. Modified
an existing site to support
4. Redesigned
existing building façade to enhance window display.
5. Created
a complete set of construction drawing.