Plans Submission Requirements Also refer to Submission Check List. |
||
| Master Layout Plans |
Required under planning conditions or lease requirements. (Samples) |
|
| Demolition Plans |
2 stages of proposal and consent are required - Precautionary Measures (hoarding, shoring, safety, etc.) - Demolition Consent application with technical details. |
|
| Hoarding Plans for Sub/Super-structure Works | a road excavation permit is required from the Highways Department after a Hoarding Permit is obtained. | |
| Site Formation Plans |
Site Formation Plans usually supported with excavation plans, ground investigation report and other geotechnical assessment reports. |
|
| Sheet piling / Shoring Plans |
submit sheet piling and shoring plan for excavation works. |
|
| Piling Plans |
detailed information of Piling Plans depends on the type of foundation used, other information and plans such as pile cap plans, site investigation report, performance review and other geotechnical assessment reports are also required. |
|
| General Building Plans |
general layout of the a building proposal, which in turn affects all other plans required to be submitted. |
|
| Fire Services Installation Plans |
this set of Fire Services Installation Plans is submitted to the Buildings Department for referral to the Fire Services Department to obtain a Fire Certificate required under Section 16(1)(b) of the Building Ordinance. |
|
| Drainage Plans |
Drainage Plans is submitted to the Buildings Department for referral to the Drainage Services Department for comments. Plumbing plans/diagrams are to be submitted to the Water Supplies Authority directly for approval. |
|
| Structural Plans |
Structural Plans follows closely the layout of the General Building Plans to show the structural framing and details for approval. Following the approval of the Structural Plans, Structural Details and Calculations are required to be submitted. Consent for commencement of building works cannot be granted until the Structural Plans have been approved. Structural Plans for window walls, curtain walls and claddings are also required. |
|
| Record Plans |
on completion of the building works, a set of as-built record plans is required to be submitted in order to apply for an Occupation Permit. Record plans for A&A works are also required. |
|
| Consent Applications |
it is important to note that for each set of the above plans or amendment of the plans, respective consents will have to be obtained after their approval. |
|
| Submissions |
Checking New building Plans - PNAP99 |
|
|
Check List |
1. Floor plans, Sections, Elevations in sufficient details; 2. Site location Plan and Block Plan 3. Adjacent Buildings shown in ground floor plan, section, elevations and site plan 4. Gross Floor Area and Plot Ratio Calculation 5. Site Coverage Calculation 6. Open Space Calculation (for domestic) 7. Site Boundary marked on ground floor plan and block plan 8. Area Calculation required under leased conditions 9. Geotechnical information if appropriate 10. Usable Floor Area Calculation 11. Discharge Value and number of persons for individual rooms 12. Exit Route provision 13. Fire resisting Period Provision 14. Schedule of Sanitary Fitments 15. Fire Services Notes and Requirements 16. Fire Resisting Door Provision 17. Overall Thermal Transmittance Value Calculation |
|
References :
Edwin H. W. Chan, "Building Control in Connection with Real Estate Development", Real Estate Development in Hong Kong, edited by T.N.T. Poon and E.H.W. Chan.
W.S. Wong, 1997. "An Outline of the Architect's Practice in Hong Kong", in Profession Practice for Architects in Hong Kong, edited by W.S. Wong & Edwin H.W. Chan.