Plans Submission Requirements

Also refer to Submission Check List.

  Master Layout Plans

Required under planning conditions or lease requirements. (Samples)

  Demolition Plans

2 stages of proposal and consent are required

- Precautionary Measures (hoarding, shoring, safety, etc.)

- Demolition Consent application with technical details.

  Hoarding Plans for Sub/Super-structure Works a road excavation permit is required from the Highways Department after a Hoarding Permit is obtained.
  Site Formation Plans

Site Formation Plans usually supported with excavation plans, ground investigation report and other geotechnical assessment reports.

  Sheet piling / Shoring Plans

submit sheet piling and shoring plan for excavation works.

  Piling Plans

detailed information of Piling Plans depends on the type of foundation used, other information and plans such as pile cap plans, site investigation report, performance review and other geotechnical assessment reports are also required.

  General Building Plans

general layout of the a building proposal, which in turn affects all other plans required to be submitted.

  Fire Services Installation Plans

this set of Fire Services Installation Plans is submitted to the Buildings Department for referral to the Fire Services Department to obtain a Fire Certificate required under Section 16(1)(b) of the Building Ordinance.

  Drainage Plans

Drainage Plans is submitted to the Buildings Department for referral to the Drainage Services Department for comments. Plumbing plans/diagrams are to be submitted to the Water Supplies Authority directly for approval.

  Structural Plans

Structural Plans follows closely the layout of the General Building Plans to show the structural framing and details for approval. Following the approval of the Structural Plans, Structural Details and Calculations are required to be submitted. Consent for commencement of building works cannot be granted until the Structural Plans have been approved. Structural Plans for window walls, curtain walls and claddings are also required.

  Record Plans

on completion of the building works, a set of as-built record plans is required to be submitted in order to apply for an Occupation Permit. Record plans for A&A works are also required.

  Consent Applications

it is important to note that for each set of the above plans or amendment of the plans, respective consents will have to be obtained after their approval.

  Submissions

Submissions to BD - PNAP58

Checking New building Plans - PNAP99

Colouring of Plans - PNAP127

Payment of Fee-PNAP132

Minor Amendments to Plans - PNAP190

Ratio of Plans - CAP123A -BO reg13

 

Submission

Check List

1. Floor plans, Sections, Elevations in sufficient details;

2. Site location Plan and Block Plan

3. Adjacent Buildings shown in ground floor plan, section, elevations and site plan

4. Gross Floor Area and Plot Ratio Calculation

5. Site Coverage Calculation

6. Open Space Calculation (for domestic)

7. Site Boundary marked on ground floor plan and block plan

8. Area Calculation required under leased conditions

9. Geotechnical information if appropriate

10. Usable Floor Area Calculation

11. Discharge Value and number of persons for individual rooms

12. Exit Route provision

13. Fire resisting Period Provision

14. Schedule of Sanitary Fitments

15. Fire Services Notes and Requirements

16. Fire Resisting Door Provision

17. Overall Thermal Transmittance Value Calculation

References :

Edwin H. W. Chan, "Building Control in Connection with Real Estate Development", Real Estate Development in Hong Kong, edited by T.N.T. Poon and E.H.W. Chan.

W.S. Wong, 1997. "An Outline of the Architect's Practice in Hong Kong", in Profession Practice for Architects in Hong Kong, edited by W.S. Wong & Edwin H.W. Chan.

 

 

 

 

 

 

 