DOCUMENTATION AND OTHER VENDOR REQUIREMENTS FOR FIXED LAMP HOLDER ES ELECTRICAL SAFETY REPORT COVERING: AS/NZS 3100:2017 Approval and test specification - General requirements for electrical equipment. AS/NZS 3140:2014 Approval and test specification - Edison-type screw lampholders OTHER MANDATORY REQUIREMENTS: DECLARED This product is a declared (AKA Proclaimed or Prescribed) article. It consequently requires a current Australian Approval certificate. In Australia it must also be registered by the importer on the ERAC Database. In New Zealand the retailer must sign and keep an on hand an SDoc (Statutory Declaration of Compliance) as well as copies of all relevant Approval documentation. PSI-GEN Pre-Shipment Inspection: Standard Checking Requirements for All Products 1. Factory address of PSI location MUST match address shown on initial Brief. (Critical Failure). Inspectors must take reasonable steps to verify that goods Inspected were actually made on those premises. 2. GB internal packing must match specification (ie styrfoam, recycled fibreboard etc) and products must survive specified-height drop test of outer carton, without obvious damage to product Giftbox. 3. Labelling of outer carton must match supplied Data 4. Artwork of giftbox must match supplied artwork 5. Packed IM must match supplied Artwork 6. Warranty information either in manual or as separate document must match supplied documentation /artwork DEC-LABELLING This item is a declared article. It must be marked and labelled in accordance with the requirements of its approval certificate. PSI-240V Pre-Shipment Inspection: Additional Checking Requirements for all mains-powered electrical products. 1. All critical components listed in Safety report must be identified and photos inserted in PSI report 2. Internal construction and wiring must match safety report. Internal Photos of an inspected sample must be included 3. Markings on Appliance, Plug, Cord and Appliance connector (if used) must match the requirements of their approval certificates. 4. If any approval date shows due to expire 6 months or less after date of inspection, shipment must be marked "Fail" pending confirmation manufacturer intends to renew. 5. Mechanical operations (switches etc) must be tested for the specified number of operations. 6. Timers must be tested for timing accuracy 7. For high-power heating appliances (heaters, irons etc) and lighting products, actual measured Power consumption must match rating label. 8. Internal construction and layout must match photos in EMC report. (Same photos as for Safety report). 9. A high-voltage (HIPOT) insulation test must be carried out, as per the safety report. If the factory does not have such facilities in-house, they will need to explain the method they use to confirm safety compliance.