| Parking Lot: Step 2 |
| Parking Lot: Step 2 |
| A solid foundation must first be made for the curbs of the parking lot. |
| Forms are built in which the concrete is poured. |
| After the concrete was poured, seams were sawed directly into the solid concrete to allow for expansion in the changing weather. |
| There were a lot of forms to build. |
| The curbs turned out just right. |