Infield transportation costs on peat soil
- The work rate of MALTRAK in infield transportation on
peat soil varied from 2 to 6 t.km/h, depending on the soil
bearing capacity and levelness of the machinery paths, and
on the distance between the loading and unloading stations.
- The cost of transportation based on a workrate of 4 t.km/hr is as
shown in the FIGURE below.
|