| HNC Building Studies work |
| Here is some of the work I did when studying for a HNC in Building Studies |
| Whilst studying for our HNC we were split in to groups and given a design brief. It was to design a reprographics factory for a plot of land near to the college. Here are some of the drawings I produced. |