![]() |
||||||||||
| Few more pics of the subframes. The main rails are all welded in and the outer bars are tacked in soe we can get the cage positioned where it needs to be then cut the tacks. That will let the cage drop down to make it alittle easier to weld up the tp of the cage. The third pic shows how far back into the rear frame the connectors went, just a few inches ahead of the hole for the LCA bolt. The last two are pics of the upper torque box after welding up all of the seems. Im not quite done with them yet..... On to page 4 |
||||||||||
![]() |
||||||||||
![]() |
||||||||||
![]() |
||||||||||
![]() |
||||||||||