|
| Since June 03, 2008 You are Visitor Number |
| Creating the Labyrinth The permanent labyrinth was started in early January, 2002. This is a narative of how I created the permanent labyrinth. The latest temporary labyrinth, which was still on the ground, had been constructed with stakes and yellow tape for Pagan Pride Day in September 2001. The Permanent labyrinth would have to be fliped so the first turn would go to the right instead of the left. Starting with this labyrinth pattern and moving the stakes and adding/removing yellow tape the permanent labyrinth pattern was first constructed using the stakes and yellow tape. January 2002 In January, 2002 the labyrinth pattern was flipped so that instead of the entrance path turning left it would turn right for the first turn. The width of the paths on the south and east side of the center were increased to 3 ft. The center was increased from 6ft by 9ft to 6ft (north/south) by 18ft (east/west). The area north of the labyrinth was cleared. The width of the paths on the north and west side of the center were increased to 3 ft. There are two trees in two of the paths. The two north paths were moved north by 3 ft so the path with the tree will be wider. The overall dimension of the permanent labyrinth is 51 ft by 51 ft. During the football playoffs in January is when I started gathering the rocks to replace the yellow tape. I remember giving up watching football on a Sunday the first time I went to gather rocks and place them on/under the yellow tape. So you know I was devoted to gathering rocks for my labyrinth. I wear work gloves and toss the rocks toward the trunk of my car and then pick them up and put them into two boxes in the trunk of my car on each trip. The larger rocks go on the outside edge and the smaller rocks go on the inside edges of the paths. I am unable to throw, lift, carry any rocks that are too big and heavy for my hands so I figure I will need about 1800 rocks. It takes many, many trips to gather rocks for 900 ft. I make trips whenever the weather is good and I feel like it. I never thought about keeping track of when and how many trips I have made hauling rocks but there are many. The paths will first be covered with weed block material and then mulch. I figure I will need 900 feet of weed block and about 150 bags of mulch. |
![]() |
![]() |
![]() |
| Sophialinus The Drum Lioness
http://MoonPathCUUPS.org [email protected] [email protected] http://groups.yahoo.com/group/MoonPathCUUPS/ |
| This picture was taken March 25, 2002 with the lights which were placed for the Vernal Equinox Ritual. |
| February 2002
On February 15, I bought 3 bags of cypress mulch, 3 bags of red mulch, and 8 rolls of 100 ft weed block to put under the mulch. I am unable to handle the bags of mulch so had someone from the store put them in trunk of my car and the next day Spelcastor took them out of the trunk and placed them on the weed block I had put on the ground in the center I then was able to open the bags and spread the mulch on top of the weed block. The cypress mulch on the bottom and the red on top. Just the center will have the red mulch. So the center is about finished and looking good. On February 23 someone offered their pickup truck and help so I bought 40 bags of cypress mulch. Then I covered the south and some of the west paths with weed block and had the bags of mulch placed on the paths to both hold down the weed block and be available in the locations where it will be spread. Then on February 26 and 28, in addition to gathering and placing rocks, I started placing the weed block so that it overlapped under the rocks so no grass or weeds will grow and spread 10 bags of mulch. The reason to overlap the weed block is so that the finished labyrinth will be as maintenance free as possible. Since the paths were marked for a width of 3 ft and the weed block is 3 ft and the rocks take up a few inches this should all work out just fine but I now find that the rocks have to be moved to fit the real world of where the weed block overlaps and really is on the ground so from now on I will work from the center out and the outside in with overlapping the weed block. And then fill in with extra weed block on the paths with the trees and any others that may need adjusting to maintain the outside dimensions. This has turned out to be the most strenuous on the legs and back so I can only work a short period of time. I got carried away on February 26 and worked twice as long as I should have and got really sore quads and back. Had to take a few days off to recover. So as of February 28, 2002 there is 636 ft of rocks, 550 ft of weed block, and 16 bags of mulch spread on the ground and the labyrinth is starting to look really good. The center will have the red mulch and the paths will have the cypress mulch. |
![]() |
| Updated 04/16/09 |
| March 2002
On March 3, 69 more feet of rocks were placed on the edges. All of the North-South edges are completed with rocks and there is a total of 705 ft completed. Yea!!!! just 195 more feet of rocks to haul for the East -West edges. More weed block was overlapped and two more bags of mulch were spread. But someone else will have to spread the mulch. The bags of mulch are much to heavy for my back to handle. YEA!!! some help has arrived to gather rocks and spread the mulch today. On March 5, 70 feet of rocks were placed on the East-West edges and the 20 bags of mulch spread on the ground. Weed block was placed on some of the East-West paths south of the center. On March 7, I bought 2 more rolls of weed block and 144 bags of mulch, 4 red and 140 cypress. March 8, the 144 bags of mulch were delivered and the final 125 feet of rocks were placed on the ground plus more weed block was placed on the paths south of the center The rest of the weed block was placed on the ground on March 9, 11, 12, and 13. About 950 feet of weed block was used on the paths. The two paths with the trees required extra weed block since they were wider then 3 feet. Now, as of March 14, all that is left is to spread the mulch, A mulch spreading party is scheduled for March 16. If enough people show up to help, all of the mulch will be spread. YEA!!!!!!! YEA!!!!!!!!!!!!! Lots of help arrived and all 144 bags of mulch was spread on the labyrinth on March 16. Then the area north of the labyrinth was cleared of weeds. |
![]() |
![]() |
| This pictures were taken March 17, 2002 The Day after it was completed |