| QUALITY CONTROL MBI will strive to achieve a reputation for uncompromising adherence to levels of quality set forth in the contract documents. Our company takes pride in delivering a product whose quality meets or exceeds the expectations of the client. MBI will continually inspect the work for compliance to quality standards, from the conceptual planning stage through closeout and occupancy. Before MBI leaves the jobsite, you can be assured that all punchlist work will be completed, Operation and Maintenance Manuals delivered, owner�s personnel training concluded and an organized program to address warranty issues will be in place. The following procedures, modified to meet each project�s unique requirements, are implemented to ensure the team�s quality goals are achieved: - During the early stages of project planning, MBI will chair a preconstruction conference with the architect and owner�s representatives to establish quality standards; - A master schedule will be prepared, phasing owner, agency and design completion dates to allow adequate time to plan, obtain approvals and construct the project to the expected quality level; - Following prequalification of subcontractors, but prior to executing subcontracts, meetings will be held with each firm to confirm their complete understanding of the quality requirements. - Prior to commencing any work in the field, MBI, principals of each subcontracting firm and on-site foremen directly responsible for installation, will agree to the means and methods of construction required to attaining the desired quality; - Shop drawings and submittals will be carefully reviewed for compliance to the contract documents; - When applicable, mockups will be constructed using specified materials installed by representative subcontractors. These mock-ups, after approval for workmanship, become the standard by which all future work will be judged; - Work inspections are conducted as soon as practical and continued on a regularly scheduled basis. As disciplines near completion, a �work list� inspection is preformed to minimize the time required to close out the project; - Systems checks are preformed at appropriate intervals to confirm proper functioning of all equipment and interfacing of trades. Operations and Maintenance Manuals will be delivered to the owner prior to establishing training sessions for operational personnel. |
![]() |