The engine is currently at the machine shop for the block work.
The bare frame after sandblasting. After final preparation it was primed with DP epoxy primer.
The rear with a fresh posi unit. The stock 3:31 gears were retained.
The frame was painted with Eastwoods Chassis black.
The frame back together. All new components including stainless lines and urethane bushings.
Rear of the frame complete.
Hosted by www.Geocities.ws

1