|
OBJECTIVE 2:
Fully utilize field staffs to coordinate
legends, conduct field studies, and
solve problems related to the soil
resources of the Indiana Headwaters
MLRA Project Office area.

GOAL B: Solve
soil correlation and classification problems and develop reliable
soil
interpretations within the project
area by collecting accurate information and
analyzing to determine its proper
application.
| Action Items
| Team Member
| Scheduled Date
| Completed Date
|
1. Identify soil investigation needs and prioritize them. (Include as Long Range Plan of Soil Investigations (LRPSI) attachment to this plan of operations.)
|
Team
|
Continuing
|
See AR
|
2. Interpretation tables
- Prepare and update data elements
- Order tables
- Review tables with technical specialists
|
Team
SDQS
|
1/98-6/98
|
SeeAR
|
3. Review and update prime farmland, highly erodible, and hydric soils lists.
|
Team
|
1/98-6/98
|
|
4. Analyze transect data to determine if existing delineations in the MLRA project area fit the slope conversion convention established by the Region 11 MLRA work group.
|
Team
|
Continuing
|
|
5. Special studies (refer to attached work plans)
- Limnic Materials Study
- Assist with wet soils monitoring project (Purdue University)
- Geomorphic, characterization, and surficial geology
- *Riddles vs. Rockrun
- **Maumee vs. Newton
- **Rensselaer till substratum
- **Bedrock extent transects
- **Iron oxide nodules in sandy soils
- **Investigate the possibilities for spodic horizons
- *Dense till under Wawasee
*MLRA region wide
**MLRA region wide and Pulaski county
|
Team
FF
SLM
RAB
WDB
RAB
SLM
WDB
SLM
WDB
|
Work plans
completed by:
12/97
Continuing
|
See AR
10/97
5/97
|
6. Sampling and lab data
- For NSSL
- For Purdue University
|
Team
|
As needed
|
See AR
|
|