OBJECTIVE 1:
Establish and implement a regional approach
to soil survey field
operations.

GOAL A: Compile
and summarize all historical data for the Pulaski County Soil
Survey
Subset Update, which includes portions
of MLRA's 98, 110, and 111, and
accurately utilize these resources
while conducting the Pulaski County Soil
Survey Subset Update.
| Action Items
| Team Member
| Scheduled Date
| Completed Date
|
1. Evaluate the 1968 published Pulaski County Soil Survey for line placement, map unit composition, and accuracy according to SSM and NSH standards.
|
Team
FF, SLM
|
10/96-6/97
|
11/96
|
2. Study the published 1908 soil survey for additional information.
|
Team
|
10/96-6/97
|
See AR
|
3. Evaluate existing laboratory data within MLRA's 98, 110, and 111 as a support resource for the project update.
|
Team
RAB
|
10/96-6/97
|
11/96
|
4. Inventory the 1968 Pulaski County Soil Survey map units to determine the distribution of the update transect load.
|
Team
SLM, FF, RAB
|
10/96-6/97
|
11/96
|
5. Conduct a literature review of all research available within the Indiana Headwaters MLRA Project Office area.
|
Team
SLM
|
Continuing
|
|
6. Develop a worksheet containing all the type locations for the soils correlated in the 1968 Pulaski County Soil Survey.
|
Team
RAB, FF
|
10/96-6/97
|
11/96
|
7. Collect references. (Also refer to NSH part 607-3, exhibit 1.)
- Water Resource Maps (flood data, contact FEMA)
- Statistical Reports
- Farm (local history, landuse)
- NRI
- SWCD (water quality information)
- Soil Series Extent Maps
- Adjacent / joining soil maps
|
Team
|
Continuing
|
10/96
10/96
10/96
10/96
10/96
10/96
10/96
|
8. Establish and maintain a MLRA reference library consisting of case files for each soil survey subset in the Indiana Headwaters Project Office area.
|
Team
|
Continuing
| |
9. Interview soil survey staff of previous soil survey projects, if available, to obtain any pertinent undocumented information about the project area.
|
Team
|
Continuing
| |
|