Our new Summerhouse at the Lake Balaton in Hungary

Although many people told us, that it is impossible to find a good company in Hungary to build a house,
we seem to have good luck. Lászlo and his team is doing a very good job ......
(click on the pictures to see more)

a "griffner-haus" was the basis of the planning ...

14.3.99:
signing the contract 
A1k.jpg (28182 Byte) A2k.jpg (26709 Byte) A3k.jpg (24570 Byte) Start
27.3.99:
ground floor and parts of the first floor
B1k.jpg (27693 Byte)

B2k.jpg (27294 Byte)

B3k.jpg (26768 Byte) 2
weeks later
17.4.99:
roof construction

 

C1k.jpg (33841 Byte) C2k.jpg (31133 Byte) C3k.jpg (30368 Byte) 5
weeks later
25.4.99:
roof finished

 

D1k.jpg (32637 Byte) D2k.jpg (29606 Byte) D3k.jpg (27798 Byte) 6
weeks later
13.5.99:
electricity, water and gas;
inside painting
E3k.jpg (4790 Byte) 8 1/2
weeks later
29.5.99:
inside floor, parts of outside painting
(pictures made with digital camera as test)
F2k.jpg (30962 Byte) F3k.jpg (28474 Byte) 11
weeks later
13.6.99:
windows
G2k.jpg (30074 Byte) G3k.jpg (28426 Byte) 13
weeks later
11.7.99:
outside painting, parts of the garden and much more ...
H2k.jpg (27590 Byte) H3k.jpg (24454 Byte) 17
weeks later
15.7.99:
proposed finish
SORRY ! (sniff) Due to the extreme delay of one company on a sub contract the house is not finished yet ! 17 1/2
weeks later
18.7.99:
more garden work, inside painting, finish of laying the tiles ...
I2k.jpg (29648 Byte) I3k.jpg (22684 Byte) 18
weeks later
14.8.99:
new proposed finish
22
weeks later -
5
months !

 

September 1999: big opening garden party

... to be continued.

back to main page


Copyright © 1999 [MKR]. All Rights Reserved.
05.08.1999.

Hosted by www.Geocities.ws

1