AUGUST 19, 2003 TUESDAY Up early, sky a bit cloudy but humid and warm. Levi and I framed the big window. It looks really sharp, although a bit narrrower than planned. Finally got Sam to finish the last of the joists. Went on to putting up the OSB on the bedroom and chimney stack. Levi and Jason went into town to rent a big ladder from Baileys and Sam and I stayed to wait for the lumber from Sutherland. WAIT was the operative word. WAIT AND WAIT. Jason and Levi returned from town and we began putting up the bedroom rafters. Lumber arrived at 4:30pm. Boy dumped it next to the first pile and managed to crack 2 of the long rafters. I WILL complain. Finally had to tell Samm off as every word was an argument and finally Jason said "It's HIS HOUSE, He's Paying for It. Just do it NOW!!!!" So I stood over Sam and told him each and every step. If he wants to be treated like a child, I will treat him that way. Sam did more work in 2 hours after I laid down the law, then he did in the last 2 days on his own. It won't last though unless I keep the pressure on. Finally cooled down around 7:30pm. You could feel a front move through. The main platform and the ramp up to the front bedroom are finally done. We decided to do away with the second front door and changed the stair hall. It now goes up a slope to the front bedroom rather than down to the front door. We will use the double doors in the dining room as the main entrance. Jason and Sam will get going on the second floor tomorrow and Levi and I will finish the last of the first floor framing. We are still about 2 days behind schedule, but should make it to the roof by the time we leave. Hopefully upstairs will go faster. I set a lamp up in the big bay window and went out after dark with Levi to look. Even unfinished, the house looks the way I have imagined it all along. Its finally getting there. |
|
|