Report for
Edwards Centre
The Horsefair
LE10 OAN
Main Contributors
Helena Spencer
Chris Hughes
Issued by
…………………………………………………………
Approved by
…………………………………………………………
Entec UK Limited
Warwickshire
CV32 6JX
Tel: +44 (0) 1926 439000
Fax: +44 (0) 1926 439010
h:\projects\ea-210\07717 - midland quarry -
nuneaton\text\supporting statement - 2nd draft.doc
Century Park Limited
Midland Quarry, Nuneaton
Planning Application Supporting Statement
April 2002
Entec UK Limited
1. Introduction 1
1.1 Camp Hill Urban
Village: The story so far 1
1.2 Purpose of Application 1
1.3 List of Information
Supporting this Application 2
1.4 Structure of
Supporting Statement 2
2. Site Description 5
2.1 Site Location 5
2.1.1 Site Context 5
2.1.2 Site Boundary and
Existing Use 6
2.2 Land Ownership 6
2.3 Site History 7
3. Description of Development 9
3.1 Outline of Proposals 9
3.2 Mix of Uses 9
3.2.1 DEV 5 Employment 10
3.2.2 DEV 11 Housing 10
3.2.3 DEV 11 Leisure 11
3.3 Density of Development 11
3.4 Access Arrangements
and Car Parking 11
3.4.1 Principles 11
3.4.2 Road Access 12
3.4.3 Car Parking 12
3.4.4 Public Transport 12
3.4.5 Pedestrian and Cycle
Links 12
3.5 Open Space and
Landscaping 13
3.5.1 Holly Stitches/Bar Pool
Brook 13
3.5.2 Quarry Edge Boundary 13
3.6 Water Feature 13
3.6.1 Quarry Lake 13
3.6.2 Coventry Canal 13
3.6.3 Bar Pool Brook 14
3.7 Ground Conditions 14
3.8 Phasing of Development 14
4. Development Principles 15
4.1 Camp Hill Urban
Village: a sustainable approach 15
4.2 Making Efficient Use
of Land and Resources 15
4.3 Providing a Good Mix
of Uses 15
4.4 Increasing
Accessibility 15
4.5 Enhancing the Local
Environment 16
4.6 Integrating Proposals
with Existing Urban Fabric 16
4.7 Providing a Safe
Living and Working Environment 16
4.8 Energy Efficiency 16
4.9 Sustainable Urban
Drainage 16
5. Meeting Policy Objectives 17
5.1 National and Regional
Context 17
5.1.1 The Urban Renaissance 17
5.1.2 National Planning
Policy 17
5.1.3 West Midlands Regional
Priorities 20
5.2 County Context 21
5.3 Nuneaton and Bedworth
Borough Council Policies and Objectives 22
5.3.1 Local Plan (Adopted and
Review Plan) 22
5.3.2 Nuneaton and Bedworth
Community Plan (2001) 23
6. Environmental Implications 25
6.1 Key Conclusions of
Environmental Impact Assessment 25
6.2 Key Conclusions of
Transport Statement 25
7. Determining the Application 27
7.1 Summary of Key
Benefits of the Scheme 27
7.2 Conclusions 27
Figure 1 Site Location Plan After Page 7
Figure 2 Camp Hill Context
Figure 3 Site Boundary
Figure 4 Land Ownership
Figure 5 Site
Constraints After Page 14
Figure 6 Development Concept
Figure 7 Development Plots
Figure 8 Indicative Masterplan
Figure 9 Transport Proposals
The Midland Quarry component of
The Camp Hill Urban Village Scheme is being
promoted by Advantage West Midlands, the Prince’s Foundation, Warwickshire
County Council and
Following the finalisation of a Strategic
Development Framework for the
The Borough Council's deposit draft local
plan references the
Century Park Limited is the company set up by land owner Mineral Investments plc to deliver the Midland Quarry redevelopment.
This planning application is an outline
application for the Midland Quarry site as part of the
This application is submitted in order to
establish whether the development proposals are acceptable in principle to the
Borough Council and
This planning application is accompanied by relevant documents containing supporting information which are intended to provide information for the Borough Council consultees, and other interested parties. The supporting information includes an Environmental Statement, which has been prepared to enable the likely significant environmental effects of the proposed development to be considered under the Environmental Impact Assessment Regulations 1999.
Details of the supporting information which accompanies this planning application are set out below in section 1.3.
The key reports and plans supporting the planning application for the Midland Quarry are listed below. This is an outline application and therefore all figures are for illustrative purposes only. The information is listed against the relevant part as follows:
• Part A: Planning Application Form and relevant certificates;
• Part B: Planning Supporting Statement;
•
Part C: Environmental Statement: Non-Technical Summary and
• Part D: Transport Statement;
•
Part E:
The following plans are included:
• Figure 1: Site Location Plan;
• Figure 2: Camp Hill Context;
• Figure 3: Site Boundary;
• Figure 4: Land Ownership;
• Figure 5: Site Constraints;
• Figure 6: Development Concept;
• Figure 7: Development Plots;
• Figure 8: Indicative Masterplan; and
• Figure 9: Transport Proposals.
Following this introductory chapter, the remainder of the supporting statement is structured as follows:
• Chapter 2 provides a detailed description of the site location, the existing uses and the development context;
• Chapter 3 explains the main elements of the proposed development areas;
• Chapter 4 summarises the key development principles underpinning the development concept;
• Chapter 5 examines the policy framework supporting the urban village and Midland Quarry proposals;
• Chapter 6 summarises the key conclusions of the Transport Assessment and Environmental Impact Assessment; and
• Chapter 7 summarises the principal benefits of the scheme and concludes by explaining why outline planning permission for the proposed development should be granted.
The location of the site of the proposed
Existing vehicular access to the site is
off Tuttle Hill via ‘Intercity Shot Blasting’ and a second access adjacent to
the Crazy Horse premises.
The Midland Quarry site is bounded to the
east by the
To the
The application site constraints are
illustrated in Figure 5. The main
development constraints within the site boundary are the existing quarry void
and cliff faces; the quarry lake and final water level, the Bar Pool Brook; and
the existing buildings on Tuttle Hill. Constraints adjoining the site include
the relationship with the
The quarry itself has been designated as a Regionally Important Geological site by the Warwickshire Geological Conservation Group.
These development constraints combine to create a complex series of integrated issues which need to be addressed to ensure a sustainable solution is promoted. The development concept produced to highlight the potential opportunities to overcome these constraints is shown in Figure 6 and described in Section 3.
The application site covers an area of approximately 21 ha. Our approach to developing the site is holistic and integrated, however in order to relate the proposals back to the Urban Village development framework and the adopted SPG the site is described in terms of the following development land parcels:
This part of the site includes the shallow void of the former quarry which is proposed to be infilled prior to development.
DEV11 also includes a number of existing buildings on Tuttle Hill, some of which are proposed for retention and some of which are intended to be demolished and replaced with more appropriate modern buildings.
Land adjoining Tuttle Hill is included in this parcel also which is currently unintensively used for storage and light industrial uses.
This area covers the main void of the former quarry which was operated by
British Coal. This is now partially
filled with water, and rising water levels have been recorded. During operation of the quarry, water levels
were controlled by pumping water from the quarry into the
This area of the site includes an overburden mound containing materials which have been excavated from the surface of the quarry when mining operations on the site began. This is intended to be used to fill the shallow void in DEV11. The southern part of this area is a marshy habitat with quite dense tree/shrub coverage. The mound is also now covered in vegetation.
This area is identified on the Borough
Green Plan as a key wildlife site, and it provides a link to a wildlife
corridor. It is also acts as a buffer
between the existing industrial estate and the disused quarry. There is also an existing footpath running
through this site along the Bar Pool Brook to the
Due to undertaking a comprehensive approach to the development of this site, there are a number of land owners with interests in the development as shown on Figure 4.
They include the former quarry site and
surrounds owned by Mineral Investments Ltd
. Other key land owners are
Midland Quarry was worked extensively for
granite and sandstone in common with several nearby quarries between
As noted, Midland Quarry is an integral
part of the
As described in section 2.1.2 of this report,
the proposed development has been approached holistically, not only within the
site boundary but within the context of the
•
INF3: New Road link connecting Tuttle Hill to
•
DEV5: Extension to
•
DEV11:
•
ENV2:
More specifically, the proposals as shown on the Development Plots on Figure 7, include the following:
•
2.45 ha of employment uses
comprising a mixture of unit sizes. This
will be B1 development, and is likely to be light industrial, incorporating
some live/work units;
•
Approximately 100 new
residential dwellings (2.8ha @ 35dph) including a mixture of type, tenure and
affordability;
•
2.02 ha of leisure/office users
to the north of the site along Tuttle Hill;
•
improved water features, including
new moorings along the
• integrated areas of open space and landscaping creating nature corridors linking east to west.
The proposed development will contain a sustainable mix of uses, each of which compliment and support the others. The positioning and nature of each of the different uses has been carefully considered in response to the site context. For example, the light industrial and live/work units on the south western part of the site (DEV 5) are intended to act as a new ‘face’ to the existing Pool Road Industrial Estate. This will not only improve the interface of the existing industry and the proposed development at the quarry site but will potentially lift the usage of the existing estate as a result. The proposed canal lock seeks to become a focal point at the node created by residential, live/work and nature corridor uses. This approach will ensure sufficient segregation of residential and work uses as well as controlling vehicular traffic flows whilst ensuring pedestrian integration of the two parts of the proposals. Leisure and offices are along Tuttle Hill to maximise the exposure to passing custom whilst also acting as a buffer between the main body of the site and the busy main road and Judkins landfill beyond. Accessibility by public transport to and from the town centre is also a key factor. The interface between leisure and residential, particularly on the canal side where new moorings are planned will need careful detailed design to maximise the benefits in terms of encouraging vitality and variety into the scheme.
The mix of uses and their appropriateness to the surrounding uses will assist in integrating the proposed development with the existing community. The potential to create cycle and pedestrian linkages eastwards towards the town centre in a new crossing over the canal is proposed utilising the pedestrian underpass under the railway line to link to the existing playing fields and beyond. The Borough Council owned land on the far bank of the Canal has significant potential to be used as a recreation node. This route can be extended across the whole of the site to include a cycleway linking through Holly Stitches to the main residential area of Camp Hill. This mix of uses also assists in maintaining activity levels in the area throughout the day, creating a more secure environment in which to live, work or enjoy leisure facilities. Encouraging a mix of uses within this area will also assist in reducing the local need to travel.
It is proposed that there is a mix of
employment uses within the
Provision of these employment units will
assist in the regeneration of the wider
Integration of the wildlife corridor is
linked to the wider water management strategy for Bar Pool Brook. The detail of
this will be developed following further studies outwith this application.
The proposals for the application site have been developed to create a high quality waterside residential development, to provide for approximately 100 new dwellings. The opportunity to create a sense of place which reacts to the canal and quarry side location has the potential to result in a unique and exciting residential based development. The latest guidance on higher densities and quality urban design, as promoted in PPG3, will influence the detailed work in bringing the proposal forward to implementation. Streets, squares, courtyard parking, landmarks and perimeter development are envisaged. The final number and mix of dwelling types will be determined at the detailed design stage, although an appropriate proportion of the new dwellings will be affordable housing. These affordable houses would be fully integrated with the market housing on site and a range of different house types would be incorporated to encourage a sustainable residential community in touch with the local market.
Leisure/office uses would be provided on
the northern part of the site, fronting onto Tuttle Hill. Leisure uses are likely to be concentrated to
the eastern corner of the site, as there is currently a former public house on
this part of the site which is likely to be retained and new moorings are
proposed on the canal making this an attractive part of the site. The leisure
uses along Tuttle Hill would be easily accessible to residents from other parts
of
In addition to these leisure uses and the
new moorings, a large lake will be a central feature of this part of the development. This will be a resource for wildlife and for
recreation, providing potential boat storage, marina and servicing facilities
linked to the canal via a lock. It is
proposed that the water level be raised to a final sustainable level of 80 AOD.
More detail on achieving this is included in Section E of the supporting
information. The leisure facilities will
provide for those living and working in the
In seeking to make the best and most
efficient use of the land resource in this part of the
The application site will be accessible by road from Tuttle Hill to the north. The INF3 alignment will serve DEV5. The INF3.1 alignment will serve DEV11 with the potential for a bus only or emergency link between the two at the lock position. Potential links south to Pool Road Industrial Estate are subject to further investigation but are shown to highlight the potential benefits. The transport proposals for the quarry site are shown in Figure 7. Pedestrian and cyclist access across the site is encouraged east to west to link destinations.
The quarry site will be integrated with the
existing highway network providing two access points off the B4114 Tuttle Hill
to the north. The access point to shown
to the east of the quarry in Figure 7 would serve some of the proposed leisure
uses to the east and the proposed housing area.
The access to the
Secondary roads off this main route would
provide access to the proposed new employment area (DEV5), to the proposed
housing area and would also serve the new leisure/office uses fronting onto the
B4114. The new road would be designed to
include traffic calming measures as appropriate.
Car parking standards would accord with the advice set out in PPG13: Transport, and would be at levels which seek to encourage the use of more sustainable modes of transport for those living and working in the area.
Wherever possible, communal parking will be
encouraged, and some on street parking may be appropriate in residential areas.
Buildings will be designed to maximise the opportunities to place parking to
the rear to create better quality urban spaces to the front of development.
Detailed car parking standards will be agreed with
A key bus route runs along Tuttle Hill to the north of the application site, and bus stops along this route are easily accessible from the site. Where appropriate links through the site and across the road could be provided to bus stops to ensure ease of access and safe access to public transport routes from the site. If appropriate bus stops could be located to be more accessible from the site.
Bus services are likely to be routed through other parts of the Urban Village site, and could form part of the bus showcase route which the Councils seeks to promote in its SPG for the Urban Village.
The
Incidental open space and appropriate
landscaping will be integrated into the proposals at an early stage to ensure a
balanced development and wherever possible existing features such as trees will
be retained. The centrepiece of the development is the improved lake and
enhanced surroundings. The wildlife corridor running through DEV 5 would also
be retained and enhanced. A footpath link across the canal will provide a
useful link from Holly Stitches to open space beyond the canal towpath, and
beyond the railway to the playing fields.
The improvement of the wildlife corridor
linking Holly Stitches via Bar Pool Brook to the
Development is planned to face onto the
lake to maximise the visual benefits of the resource. Roads therefore encircle
the quarry edge which will be landscaped so as to maximise the visual links
whilst ensuring a safe distance is maintained from the quarry edge.
The development proposals involve raising the water levels in the quarry to around 80 AOD, subject to further investigation, to form a central lake feature to the development. This will also provide a recreational and wildlife resource. It is proposed that this has potential to be used as a canal boat marina for boat storage, houseboats and servicing. This could be linked to the canal vial a lock. This central water feature will assist in creating a pleasant environment in which to live and work and will provide an attractive outlook for the proposed housing, employment and leisure uses.
The lake will also offer an important ecological habitat in the area.
More information on the proposals for the quarry lake are set out in Part E of the supporting documents.
The
The third water feature on the site will
link Holly Stitches to the
Ground improvement and stabilisation works will be required to deliver the proposals set out in this statement. Ongoing and future site investigations will result in an engineering strategy to achieve a physical land quality that is suitable for use in respect of the foundations requirements of the proposed development.
Further information on this issue can be found in Part E of the supporting documents.
The development of this site has a number
of logistical and procedural constraints which will influence the phasing of
the development. It is envisaged that for land reclamation purposes a temporary
access to DEV5 will use the INF3.1 access point and go along the canal-side.
This will then be used to move the overburden from DEV5 to the shallow void on
DEV11. Meanwhile reserved matters approval for INF3 will be sought to serve
DEV5 once the overburden is removed. The fill in the shallow void will then
need time to settle so DEV5 will be developed in the interim. Leisure and
office units along Tuttle Hill would then be developed on DEV11. INF3.1 can
then be built off which the housing on DEV11 will come forward together with
the moorings. The filling of the quarry with water to form the finished lake
will be on-going following the settlement of the shallow void. The lock
connection to the canal would be the last piece of the development completed
when the lake reached a sustainable finished water level.
In line with current Government guidance
and good practice, the proposals for the quarry site have been guided by the
principles of sustainable development, which have been incorporated into all
stages of development of the proposals.
The quarry site will be developed in the context of the
Much of the
Developing quarry site will deliver a
number of houses and leisure facilities and importantly provide local
employment opportunities in the area.
This will assist in meeting
The quarry site will be based on high standards of design and will be developed at relatively high density to ensure that resources are used efficiently, whilst still creating a high quality urban environment.
As described in section 3.2 of this report
the application site will provide a good mix of uses, and will include a mix of
tenures, types and sizes of dwellings, and a mix of types of employment and
leisure uses. This will ensure that a
balanced community is created and is well integrated with the existing uses on
the site. This mix of uses means that
those working and living in the
The quarry site will be opened up via new roads and footpaths, which will enable residents and visitors to take advantage of new leisure and recreational facilities on site. Residents and those working on the site will have easy access to nearby bus routes which will form part of the showcase route. Natural traffic calming measures will be used wherever possible to lower vehicle speeds and to ensure a safe environment for pedestrians and cyclists.
In many parts of the site car parking will be limited to communal car parking to encourage the use of modes of transport other than the car.
Landscaping, incidental open space and water features will be incorporated into the proposed development of the quarry site. Wherever possible existing features such as tress and any wildlife corridors will be retained as part of the development. Recreation uses, such as the proposed marina will assist in creating a pleasant working and living environment, and also act as a recreational resource for the surrounding communities. The proposed development will result in significant improvements to the environment through remediation measures, creating ground conditions which are suitable for development.
Attention has been paid as to how the proposed development on the application site will be integrated with the existing urban fabric. This ensures that existing residents benefit from the new development and can part of it. This is particularly the case in the north western part of DEV5 which is close to existing residential areas.
Facilities and services in the area will
benefit from the increase in the population and the increase in the number of
people working in the
The quarry site has been designed to ensure that open space and footpaths are visible to assist in reducing opportunities for crime. The over looking of footpath routes will encourage users to feel safe and thus encourage footpath use, assisting in the aim of reducing the need to travel by car. The detailed design of buildings will also ensure that areas are not vulnerable to crime, for example in the proposed housing area, cul-de-sac development will be avoided.
The detailed layout of buildings will ensure maximum use of passive solar gain and buildings will be orientated to ensure maximum daylight.
Sustainable urban drainage techniques will
also be used wherever possible throughout the proposed development.
The delivery of new
The Government has committed to delivering
an urban renaissance within
This approach is complemented by the Transport White Paper: A New Deal for Transport: Better for Everyone, which outlines the need for an integrated approach to the delivery of land use and transport planning. The policy objectives require new developments to be located in areas where the existing choice of alternative modes of transport are high, and for new schemes, to identify opportunities for enhancing walking and cycling networks and integration with public transport.
The quarry site offers the opportunity to deliver a sustainable mixed use development including housing, employment and leisure uses on a previously developed site which is in need of environmental improvement.
National planning policy guidance sets out
a clear framework of policies which support the objectives of the urban
renaissance. The key national planning
issues of relevance to the
The concept of major mixed use or ‘urban village’ style development is supported in PPG1: General Policy and Principles which sets out the Government’s approach to planning. It states that the urban village concept is supported where the development is characterised by a mixture of residential, employment, leisure and community facilities and where high standards of design are applied including good access to public transport and public open space.
PPG1 requires local planning authorities to consider what opportunities exist for incorporating such urban village style developments within any part of their area, and states (at paragraph 12) that they are characterised by:
• Compactness;
• A mixture of uses and dwelling types including affordable housing;
• A range of employment, leisure and community facilities;
• High standards of urban design;
• Access to public open space and green spaces; and
• Ready access to public transport.
It is also noted that such proposals for
urban villages may incorporate existing development, as is the case at the
The proposals for the quarry site include a number of these characteristics, such as a mixture of uses and dwelling types (including affordable housing), employment and leisure uses, all of which will be developed to a high standard.
Planning Policy Guidance Note 1: General Policy and Principles, sets out the general policy and principles underpinning the Government’s approach to the planning system. PPG1 confirms that the government is committed to promoting more sustainable forms of development by:
• Giving priority to the development of land within urban areas, particularly on previously developed sites;
• Concentrating major new development in locations well served by public transport especially where these are close to existing town centres.
PPG3: Housing and PPG13: Transport both support the principle of creating sustainable patterns of development by promoting new development in locations within urban areas and in accessible locations close to existing town and district centres. Specifically, PPG3 encourages new development to be mixed in nature and to make efficient use of land.
To make efficient use of land, PPG3 supports greater intensity of development at places with good public transport accessibility. In parallel to high standards of urban design, high density development is encouraged as is the application of flexible parking standards. Significantly lower levels of car parking are expected in locations which are readily accessible by walking, cycling and public transport.
The proposals for the application site
incorporates all of these elements of good practice as described above and will
deliver a sustainable pattern of development in line with Government
guidance. Development of the quarry site
in accordance with this good practice will contribute towards the sustainable
development of the whole of the
In considering the suitability of sites for housing, PPG3 (at paragraph 31) requires local planning authorities to assess the potential and suitability of development against a number of criteria. The proposed housing development at the quarry site is considered against these criteria in Table 5.1 below.
Table 5.1 PPG3 Site Suitability Criteria and quarry site
|
PPG3 Paragraph 31 Site Suitability Criteria |
Quarry Site Assessment |
|
The
availability of previously-developed
sites and empty or under-used buildings and their suitability for housing
use |
The proposals will assist in bringing derelict areas back into productive use to create a high quality urban environment which is attractive for those who live and work in the area. |
|
The
location and accessibility of
potential development sites to jobs, shops and services by modes other than
the car, and the potential for improving such accessibility |
The quarry site is located around
1.5 km from the centre of |
|
The capacity of existing and potential infrastructure, including public transport, water and sewerage, other utilities and social infrastructure (such as schools and hospitals) to absorb further development and the cost of adding further infrastructure |
The |
|
The
ability to build communities to
support new physical and social infrastructure and to provide sufficient
demand to sustain appropriate local services and facilities |
A mix of housing types will be
provided within the |
|
The physical and environmental
constraints on development of land, including, for example, the
level of contamination, stability and flood risk, taking into account that
such risk may increase as a result of climate change |
The quarry site will require land reclamation work to make the area safe for development and there will be a need to raise water levels in the quarry. |
PPG3 encourages local planning authorities to place particular emphasis on the ‘greening’ of new developments. Green areas are recognised as enhancing the quality of new developments while also assisting the permeability of land for storm drainage and contributing to biodiversity.
Planning Policy Guidance Note 9: Nature Conservation (PPG9) also advises local planning authorities to make adequate provision for development and economic growth whilst ensuring the effective conservation of wildlife and natural features.
Planning Policy Guidance Note 17: Sport and Recreation (PPG17) also sets out the importance of Government places on ensuring that there is a suitable level and scale of recreation and amenity open space. PPG17 advises that local planning authorities should seek to achieve a reasonable balance between the need to make adequate provision for development in urban areas and the need to protect open space from development.
Chapter 3 of this statement explains the
components of the proposed development.
Open space is important within the
The Approved Regional Planning Guidance for
the
The RPG is currently being reviewed, and in November 2001 a Deposit Draft version was produced. Urban renaissance plays a key part in the new strategy , and an important objective of the strategy is to make the Major Urban Areas (MUAs) of the region attractive places where more people will choose to live, work and invest. Policy UR1 of the draft states that:
“Within each MUA, the creation of a variety and choice of high quality living and working environments will be achieved through a comprehensive approach, where quality is raised throughout all areas, and through the promotion of a radical large scale change in selected areas to create new choices.
In each case, opportunities will be sought for:
a) increasing overall housing densities, though lower than average density development may be appropriate in some local authority areas to provide quality and choice, particularly to provide larger homes which would otherwise be in short supply;
b) raising the quality of urban design in both existing areas and new development, including a contribution to the reduction of crime and increasing accessibility;
c) maximising the use of the existing housing and business stock where economically and socially viable;
d) identifying areas for large scale change where existing residential and business stock is no longer sustainable;
e) ensuring appropriate levels of quality open space are provided;
f) developing integrated renewal strategies for the most deprived communities;
g) facilitating the provision of high quality health, education and other services; and
h) the provision of mixed tenure neighbourhoods, incorporating affordable social and market housing”
The proposed development at
The application site falls within the
The Warwickshire Structure Plan (Adopted 2001) provides the strategic policy context within which the application for the quarry site development will be determined. The key principles of this plan are to provide for the needs of the whole community during the plan period, conserve resources of land and energy and promote greater use of public transport and modes of transport other than the car.
Policy GD5 of the plan sets out the locations
where districts should provide for most new housing and industrial development,
and puts these in order of priority, the first of which is within existing
built up areas of towns over 8,000 people that lie within recognised transport
corridors. The second includes two broad
locations, one of which is in
“In considering the allocation and release of land, local plans should have regard to the availability of previously developed land and buildings and allocate and provide for such sites to come forward where they meet these criteria……”
The proposed development at the quarry site
and at the
Policy H1 of the Plan makes provision for
around 31,100 new dwellings in Warwickshire over the period 1996 - 2011. Around 5,600 of these have been allocated to
be developed in
Development at the application site will assist in meeting these dwelling requirements and will also assist in meeting the percentage of dwellings to be developed on previously developed land and will contribute towards affordable housing in the Borough.
Policy I.2 provides for around 768 ha of
land for industrial development between 1996 and 2011. Of this 132 ha is provided for in
Policy I.8 relates to new tourist, leisure and recreation development, and states that such facilities will be supported where they will create new jobs to meet local needs, and where there is easy access to the main transport routes and urban areas. The proposals for the quarry site include proposed leisure uses to the north of the site, which are in accordance with this policy as they will provide employment opportunities for those living in the area, and will also benefit the new and existing community on the site.
The
Policy H1 of the Plan sets out the housing
needs of the Borough for the period up to 2011.
Of the 5,600 Structure Plan dwelling requirement for the Borough, a
significant number of dwellings have been completed or have planning
permission, leaving only 771 to be allocated on new sites. The policy identifies 179 dwellings to be
developed in the
Policy H2 of the plan seeks 30% of all new dwellings on sites of 0.4 hectares or more to be ‘affordable’ and Policy H4 seeks a mix of house types and sizes which should vary according to the nature of the development. An appropriate number of affordable dwellings would be developed on the application site, and a mix of types of dwelling would also be provided. The exact details on the mix would be decided following discussions with the Borough Council at the detailed planning stage.
The density of housing development on the application site would accord with Policy H11 which requires densities to be between 30 and 50 dwellings per hectare. There is likely to be a mix of densities on the site, for instance high density development may be appropriate along the canal frontage.
The Plan states that the Borough has some of the most deprived wards in Warwickshire and some of the highest rates of unemployment, and that new jobs are essential to reverse these weaknesses. The provision of employment uses on the site will assist in providing opportunities in the area, both for the existing and new community.
Policy R9 of the Plan seeks to promote the recreational use of the Borough’s rivers, canals, lakes, reservoirs and other water bodies as long as the use is not detrimental to water quality or the ecological value of the area, it will not cause undue disturbance to adjoining residents, adequate measures are taken to ensure security and safety on and around the water body, and there is adequate access. The proposed water feature, including marina in the application site accords with this policy.
Policy Env3 states that development within Flood Plains will not normally be permitted unless there are strong mitigating circumstances why development should be allowed. A small area of land either side of the Bar Pool Brook on the application site may be liable to flooding. No built development will take place in this area, and existing planting will remain.
Policy Env19 requires that development which fronts rivers and canals in the Borough should be of a high standard of design and should take advantage of the vista across the river or canal, and that improvements may be required to the banks as part of the development. The proposed development would be of a high standard and will be designed to create an attractive environment. Use will be made of the canal to create attractive dwellings at an appropriate density fronting on to the canal. The canal environment will be improved through the creation of new moorings and a lock, and general improvement would be carried out where appropriate, and following detailed discussions with the Borough Council.
Policy T1 requires that new road infrastructure be designed and provided in accordance with Warwickshire Transport and Roads for development Guide. This Guide will be used in the design of the road infrastructure at the detailed design stage.
This Plan entitled ‘Shaping Our Future’ is
based on the principle of improving the quality of life in the Borough. The Plan supports the comprehensive
regeneration of the
• Safety in local communities;
• Valuing, protecting and enhancing open spaces, wildlife and habitats;
• Leisure and Community facilities that are easily accessible for all;
• Clean environment; and
• Strong communities.
Development at the quarry site, as part of the
wider development of
Appropriate remediation would be undertaken to ensure that the environment is suitably clean before development takes place on the site. The site would be planned to ensure that the new development is well integrated with existing development, and that a mix of uses can assist in creating a sense of community. Individual parts of the development would be designed to ensure that there is less opportunity for crime, for example so that key areas, and footpaths are overlooked by the surrounding development.
The environmental impact assessment has predicted that the Midland Quarry proposals will have no significant adverse environmental effects once the development is complete. The area is considered to be of negligible value for nature conservation with Bar Pool Brook having local/parish importance for nature conservation and is as such incorporated into the proposals as a nature movement corridor. The important feature is to link the canal to Holly Stitches which provides a link across the whole site thus promoting habitat continuity. The site is also demonstrated as capable of absorbing the proposed development without significant detriment to local visual amenity.
The environmental statement which can be found in Part C of the application pack, highlights a number of substantial environmental benefits. These include providing significant socio-economic and regeneration benefits, cleaning up a large area of currently contaminated and derelict land and bringing it back into productive use, and creating a significantly improved landscaped area and an environment of high quality, which both existing and new residents, workers and visitors will be able to benefit from.
A preliminary transport statement has been produced to consider the issues to be addressed in a full transport assessment of the Midland Quarry proposals. The statement refers closely to the Warwickshire County Council report no. 107 ‘Camp Hill Urban Village Regeneration Project - Transport Impact Assessment’. The full transport assessment will follow shortly after the submission of the outline application.
The transport statement anticipates a full and thorough assessment to be undertaken into the trip generation and distribution generated by the proposed development. The development concept has already embodied sustainable transport principles such as maximising the opportunity for public transport and ensuring links between various forms of transport such as cycling, walking and canal boating.
The transport strategy for the development revolves around two access points of Tuttle Hill. One primarily serving the employment on DEV5 via the route of INF3 with a possible link to the Pool Road Industrial Estate. The other primarily serving the offices/leisure/residential via the INF3.1 route with a possible emergency only connection or bus route only connection to the INF3 route. This ensures a sensible distribution of traffic relative to the area it is serving. Stage One Safety Audits of the two junctions will be included in a broad approach to road safety.
It is expected that there will be high level of use of public transport to move to and from the site, and the anticipated improvements to the pedestrian and cycle links will encourage greater use of these methods by existing residents and workers as well as the new.
Development of the Midland Quarry site forms a key part of the proposals for the redevelopment of the Camp Hill Urban Village. The proposed development will greatly assist in the regeneration of this part of Nuneaton. Development of the site would create a high quality sustainable urban development which will provide a number of benefits to existing residents and workers and for new residents. The proposals encompass good practice in urban design and incorporate the principles of sustainable development.
The key benefits of the scheme are set out below:
• Providing approximately 2.45ha of employment land on a derelict site, creating employment opportunities for the local community;
• Providing approximately 2.02ha of leisure / office land complementing the above employment provision;
• Providing approximately 100 new homes on a derelict site, assisting in meeting the Borough Council’s housing targets on previously developed sites and in providing affordable housing;
• Developing the site reduces the need for greenfield sites to be developed for employment and housing to meet the Borough’s land requirements;
• The creation of a central water feature providing a wildlife and recreational resource, incorporating a new marina, and lock, linking the canal to the quarry lake and improvements to the canal;
• The opening up of the site, including recreational uses to the wider community, assisted through the retention and where appropriate creation of new footpath and cycle links through the site; and
• Enabling significant environmental improvements on the site, which currently consists of under-used or derelict land and a disused quarry.
This statement has set out a number of reasons why the Borough Council should grant outline planning permission for the proposed development of the quarry site. Importantly, development of the quarry site will assist greatly in moving forward the Borough’s plans for the whole of the Camp Hill Urban Village. As part of the wider Camp Hill Urban Village development it will create a high quality mixed use sustainable urban development which will assist Nuneaton and Bedworth Borough Council in the regeneration of the area and in meeting their housing and employment land requirements. The proposals are based on national planning guidance and good practice, and are supported through Regional Planning Guidance and Strategic Planning Guidance at the County level.
The proposed development accords with the Development Plan, and also accords with the policy set out in the emerging Local Plan (the Nuneaton and Bedworth Borough Deposit Draft Local Plan, 2001).