PRODUCTION MODEL
|
|
WITH THE R& D MODEL SUCCESSFUL PASSED THE THREE MOUTH TRIAL PERIOD AT LONDON TRANSPORT MUSEUM WE STARTED TO BUILD THE PRODUCTION BOARDS ONE POWER CONTROL BOARD, ONE CONTROL BOARD AND ONE LIGHTING CONTROL BOARD. THE DESIGN WAS FOR EASY MAINTENANCE AO AS TO KEEP THE DOWN TIME OF THE EXHIBIT TO A MINIMUM. ALSO TO INCLUDE A LIGHT INDICATOR TO HIGHLIGHT WHICH FUSE HAD BLOWN IF IT WAS REQUIRED.
|
|
THE FINISHED PRODUCT IS NOW INSTALLED AT LONDON TRANSPORT MUSEUM COVENT GARDEN ON THE DOCKLAND LIGHT RAIL EXHIBIT.
|
|
IT WAS INSTALLED IN 2001 AND HAS BEEN RUNNING FROM 10.00HRS TO 18.00HRS 7 DAYS A WEEK, WITH NO DEFECTS TO DATE.
|
|
LONDON TRANSPORT MUSEUM ARE 100% HAPPY WITH THE RELIABILITY AS QUOTED FROM AN EMAIL.
|
|
From:
|
To:
|
Subject: RE: DLR
|
Date: 06 March 2001 12:18
|
|
Hello Ron,
|
Thanks for the e-mail I was just on the point of contacting
|
You... not because were having any problems with the DLR, but because infact we�re experiencing the opposite. So far the model has been 100% reliable. So thanks very much for your commitment in getting the thing running again. It�s appreciated not only by hordes of screaming children who follow it from one end to the other but more importantly by me for getting people off my back.
|
|
Once again thanks for your work on the DLR.
|
|
|
Paul
|
|
|
A PROJECT DESIGNED BUILT AND INSTALLED BY M.E.T.E.R. ELECTRONICS TO A VERY SATISFIED CUSTOMER, PLEASE GO AND SEE IT IN OPERATION IN LONDON.
|
RETURN TO HOME PAGE
|