| Slowly we began hanging the sheetrock on the ceiling and around the stairs. Lights anxiously hung so that we could get a feel for what it would look like when we got through. A support brace was put up so that a sheet of plywood could be laid across the opening of the balcony, and wiring and sheetrock could then be put up above the balcony in the loft. |
![]() |
![]() |
| In December 2000, we started running the wiring, poking the insulation in the outside walls and hanging some of the ceiling sheetrock. Getting the lighting fixtures up helped us work after dark. |