CONSTRUCTION Page 4
By the end of April, we began the second floor, which is the loft (spare bedroom/sitting room.)  It looks down into the den.  With the Spring rains upon us, we would work until the rain actually started.  Many an evening was spent vacuuming water out of the basement.
TO PAGE 3
TO PAGE 5
Climbing Up to the Second Floor
Hosted by www.Geocities.ws

1