Home First Building Project - Phase Two.
Now that the roof was on, work could start on the interior.
$5,000 (�2,941) was transferred in September 2005 for this work to take place.
Underfloor stone.
October 2005.
Laying the classroom floor.
October 2005.
Mixing concrete for the floor.
October 2005.
Site meeting.
October 2005.
Door frames installed.
November 2005.
Window frames installed.
November 2005.
Desks and benches are hand-crafted.
November 2005.
Blackboards are installed.
November 2005.