LAB # 8

Suppose that all outlets drain were closed and build dike

in the same height of road level followed pole lines. Calculating ,rain water volume is 10 mml .

How long does it take to fully flood road ?

 

Instrument

- Telescope
- Telescope Stand
- Staff Rod
- Bubble Staff
- Tape

 

1.Set up the telescope and focus it to BM .
2.Focus the telescope to every need IFS .
3. Focus the telescope to BM .Calculating result data .

 

 

 

 

 

 

 

Hosted by www.Geocities.ws

1