|
Removing a 2-year-old Footbridge


The KMK5120 was lifting the second part of
the bridge, while the LTM1200/1 was dismantle its own counterweights.







The lift was finished on time and the cranes
and trucks left the site, the highway reopened at 6:00am.
 
Back
to Homepage |