Removing a 2-year-old Footbridge


The KMK5120 was lifting the second part of the bridge, while the LTM1200/1 was dismantle its own counterweights.


The lift was finished on time and the cranes and trucks left the site, the highway reopened at 6:00am.

Back to Homepage

Hosted by www.Geocities.ws

1