SOUTHBURY LIBRARY
CONSTRUCTION HIGHLIGHTS
Site preparation begins.
Pouring concrete.
Smoothing the basement floor.
Lifting steel.
Bolting the second floor beams.
Spreading concrete on the first floor.
Part of the steel deck, which forms the basic support for the floor is visible in the foreground.  Also, some of the reinforcing steel, which will be imbedded in the concrete, is visible.
All the available construction photos to date.
Cutting steel studs for the first-floor exterior walls.
November 30, 2004
Laying brick
January 20, 2005
First look at some of the offices.
February 9, 2005
Windows
ready to install

March 17, 2005