Float Restoration from Wood to Metal 2008
I bought this Horse float
30th April 2008
This is the Back of the float
(pic taken by ebay seller)
RESTORATION'S BEGAN
3rd May 2008
NEW Jockey wheel welded on  3rd may 08
NEW Hydraulic Tow Cuppling 4th may 08
NEW Guard's 7th May 08
Paint  bought 10th May 08
New Brakes 7th June 08
New front door 9th June 08
New Guards 14 June 08
Bought
NEW Hub Cap's 19 June 08
New Clearence lights 28th June 08
New panel flooring 28th June 08
New STeel chest bar 28th June 08
Registered 4 July 08
Wall Padding  /Chest rail  padding 11 July 08
Leaving a Nice  clean base floor
to start working with
up comes the rubber
up comes the top floor
The frame and floor structure is STRONG and in exellent condittion
Hubby Helping Me
we took turns washing the roof with
sugar soap Scrubbing the
Moss & tree sap
Windows out
10th May 08 Frame stripped of ALL wood panel's
cutting Old small door frame out to make a FULL Length door
Comparing the Old with the New
Hosted by www.Geocities.ws

1