| Float Restoration from Wood to Metal 2008 |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| I bought this Horse float 30th April 2008 |
| This is the Back of the float (pic taken by ebay seller) |
| RESTORATION'S BEGAN 3rd May 2008 NEW Jockey wheel welded on 3rd may 08 NEW Hydraulic Tow Cuppling 4th may 08 NEW Guard's 7th May 08 Paint bought 10th May 08 New Brakes 7th June 08 New front door 9th June 08 New Guards 14 June 08 Bought NEW Hub Cap's 19 June 08 New Clearence lights 28th June 08 New panel flooring 28th June 08 New STeel chest bar 28th June 08 Registered 4 July 08 Wall Padding /Chest rail padding 11 July 08 |
| Leaving a Nice clean base floor to start working with |
| up comes the rubber up comes the top floor |
| The frame and floor structure is STRONG and in exellent condittion |
![]() |
| Hubby Helping Me we took turns washing the roof with sugar soap Scrubbing the Moss & tree sap |
![]() |
![]() |
![]() |
![]() |
| Windows out |
| 10th May 08 Frame stripped of ALL wood panel's |
| cutting Old small door frame out to make a FULL Length door |
![]() |
![]() |
| Comparing the Old with the New |
![]() |
![]() |
![]() |
![]() |
![]() |