Ballyshannon
bypass
Back to Index Page
Pictures and details by  Joseph Drummond
Ballyshannon and Bundoran Bypass
Following illustrations have been published by NRA (National Roads Authority)
Preferred route is shown in solid red line.
Contract is being signed this Friday. 23.07.2004
Work to start immediately.
Main feature of project is new two tier(lower tier walkway) bridge over river Erne between ESB powerstation and original bridge.
1