 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
Anchor Handling |
|
|
|
Perhaps in the offshore world the anchor handling are the more difficult tasks, because you work with wire in great tensions that difficult the tug manouvre and can injure the deck crew. |
|
|
|
 |
|
 |
|
|
|
|
|
We are in reposition manouvre, can see the wire in high tension because leg platform are 1,5 m inter. |
|
|
Towing the Petrobas 6 in Sergipe Petrobras field, Brasil. February 2005. |
|
|
|
|
|
|
 |
|
|
|
 |
|
|
|
|
|
The anchor is a Delta type with 12 mt. |
|
|
 |
|
|
|
|
|
|
 |
|
|
|
|
Piggy back anchor system. |
|
|
|
|
|
|
 |
|
|
|
 |
|
|
|
|
|
The partners, Jose Luis "Pepe" Moro(Ch. eng.), Javier Torello (Master), Down: Martin Rossano ( 1 mate), Alejandro Gotte (1 Eng.). |
|
|
|
|
The Seacor Lilen, 9.000 HP. |
|
|
|
|