%%HP: T(1)A(D)F(.);
"'EJ. TANQUE SEDIMENTACION
DATOS:
FLUJO=15 P^3/S

V=Q*DT
V=15*(4*60*60)
V=216,000 P^3

AS=Q/CS
AS=15 P^3/S /(600 GPD/P^2)
PARA OBTENER MGD,SE DIVIDE
P^3/S ENTRE 1.55

PARA OBTENER P^3/S, MULTI-
PLIQUE MGD POR 1.55

AS=(15 P^3/S / 1.55)*10E6 /
600 GPD/P^2

AS=16,129.03 P^2
L/A=4,
L=4*A
AS=L*A, AS=4A*A, AS=4A^2
A=(AS/4),A=63.5 P
L=4(63.5)=254 P
V=AS*H
H=V/AS,=216000 P^3/16,129.03 P^2
=13.39 P

V=Q/A*H
V=(15 P^3/S * 60 S/MIN) /
(63.5 P * 13.39 P)
V=1.05 P/MIN
USAR:
A=63.5 P
L=254 P
H=13.39 P'"