Crain
  Cut crain releife
  mount and glass crain bushing
  mount crain bottom stop
  lower crain into place
  make electrical and control conentions to wires already in place
  paint bottom stop and bushing to cosmetic finish

Glass dink cradle
  Drape cradle structure already there with 1708 biaxial and resin
  paint to cosmetic finish

Pulpit
  remove rotted pulpit
  cut pulpit from 3/4 untreated plywood
  glue pulpit to deck
  replace chocks, samson cleats, emergency winch, anchor roller
  cut rope haws and chain haws install stainless haws gaurds

Drum winch
  bolt winch inside chain locker
  make electrical power and control connections to wires already there

Decks
  sand and clean with accetone  aft deck, fore deck, fly deck  2 days each  total 1000 sq ft
  lay one layer of 1.5 oz matt to re-seal areas exposed too long to the sun
  roll marine deck white gelcoat with anti skid.
  This is a decent cosmetic finish already
  install wood over gelcoat finish with ashesive if desired later

Glass aft sun
  1.5 oz glass over unprotected sun deck structure

Cleats
  at any time before finish interoir ceiling panels place four layers of 1708 biaxial against hull upper edge and lay under deck
  drill 3/8 hole for the four reinforced cleats and install with 3M 5200 under cleat.

Swim deck and swim deck enclosure
  lightly sand and clean with aceton enclusure walls
  use polyester fill with plastic knife
  sand and paint total 120 sq ft wall area
  remove temprorary plywood deck
  replace with 5/4 plastic wood deck
  mark and cut and screw
  fill screw holes  total 90 sq ft
  cut edge flush and trim with rubber dock gaurd
  Trim deck and enclosure seam with treatede quarter round
  opaque white stain 
 
Superstructure fairing
  lightly sand and clean with aceton enclusure walls
  use polyester fill with plastic knife
  sand and paint total 700 sq ft wall area
 
Rails
  place 36 aluminum or stainless deck rail fittings with a temporary screw to finish deck for rails
  and 10 deck rail fittings for two ladders between decks
  place each on top of a 6x6" ply wood protector
  cut 20 30" styles
  place 14 saw horses made to 27"
  place 1.5" 2x4 across saw horses to extend beyond deck edges
  lay length of rails accross the 2x4 on both port and staboard
  tie the rails together across the deck to draw them together to follow the deck curve
  fix rails to 2x4 temporary   dont damge cosmetic finish of the rails
  fit each of the 36 styles mark and grind on a jig to make the work fast
  fit the styles between the deck rail fitting and the rail.  tack with a rented mig welder
  remove all saw horses
  bend the ladder rails with $20 pipe bender and a towel  no need to hire that done
  cut and grind the ladder rungs
  fit the ladder rails and tack weld the rails
  hire a profesional welder to finish the welding
  remove protection plywood under deck rail fitting and secure with three screws and 3M5200

Complete finish of all extreior of Hadar