| Crain
Cut crain releife mount and glass crain bushing mount crain bottom stop lower crain into place make electrical and control conentions to wires already in place paint bottom stop and bushing to cosmetic finish Glass dink cradle Drape cradle structure already there with 1708 biaxial and resin paint to cosmetic finish Pulpit remove rotted pulpit cut pulpit from 3/4 untreated plywood glue pulpit to deck replace chocks, samson cleats, emergency winch, anchor roller cut rope haws and chain haws install stainless haws gaurds Drum winch bolt winch inside chain locker make electrical power and control connections to wires already there Decks sand and clean with accetone aft deck, fore deck, fly deck 2 days each total 1000 sq ft lay one layer of 1.5 oz matt to re-seal areas exposed too long to the sun roll marine deck white gelcoat with anti skid. This is a decent cosmetic finish already install wood over gelcoat finish with ashesive if desired later Glass aft sun 1.5 oz glass over unprotected sun deck structure Cleats at any time before finish interoir ceiling panels place four layers of 1708 biaxial against hull upper edge and lay under deck drill 3/8 hole for the four reinforced cleats and install with 3M 5200 under cleat. Swim deck and swim deck enclosure lightly sand and clean with aceton enclusure walls use polyester fill with plastic knife sand and paint total 120 sq ft wall area remove temprorary plywood deck replace with 5/4 plastic wood deck mark and cut and screw fill screw holes total 90 sq ft cut edge flush and trim with rubber dock gaurd Trim deck and enclosure seam with treatede quarter round opaque white stain Superstructure fairing lightly sand and clean with aceton enclusure walls use polyester fill with plastic knife sand and paint total 700 sq ft wall area Rails place 36 aluminum or stainless deck rail fittings with a temporary screw to finish deck for rails and 10 deck rail fittings for two ladders between decks place each on top of a 6x6" ply wood protector cut 20 30" styles place 14 saw horses made to 27" place 1.5" 2x4 across saw horses to extend beyond deck edges lay length of rails accross the 2x4 on both port and staboard tie the rails together across the deck to draw them together to follow the deck curve fix rails to 2x4 temporary dont damge cosmetic finish of the rails fit each of the 36 styles mark and grind on a jig to make the work fast fit the styles between the deck rail fitting and the rail. tack with a rented mig welder remove all saw horses bend the ladder rails with $20 pipe bender and a towel no need to hire that done cut and grind the ladder rungs fit the ladder rails and tack weld the rails hire a profesional welder to finish the welding remove protection plywood under deck rail fitting and secure with three screws and 3M5200 Complete finish of all extreior of Hadar |